Verwandte Artikel zu Critical Paths: Blake and the Argument of Method

Critical Paths: Blake and the Argument of Method - Hardcover

 
9780822307518: Critical Paths: Blake and the Argument of Method

Inhaltsangabe

The great expositors of Blake and those who have followed in their footsteps have clarified the most minute particulars of Blake's vision. Now, in the place of traditional exegesis, comes a significantly new set of critical problems and interpretive methods. In this volume of essays, the major shift in Blake studies, already under way in practice, is addressed, gauged, analyzed, and debated.

The contributors assembled here, leading exponents of contemporary critical methods as well as close students of Blake, argue the grounds, purposes, and validity of each approach and then apply its method in detailed readings of Blake's works. We see deconstruction, psychoanalytic interpretation, feminist critique, semiotic analysis, Marxist criticism, revisionism, and other methods brought to bear on Blake's texts and into confrontation with one another by those best able to do so.

Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.

Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.

Von der hinteren Coverseite

"This timely collection of essays ads tot he momentum that has been building in recent years for a fresh start in Blake studies--an impulse both to cleanse the doors of perception of Blake's critics and to sweep out the interpreter's parlor in which his now-familiar body of poetry has come to reside. . . . The most appealing feature of "Critical Paths" is its spirit of exploration--its zest in challenging cherished assumptions, its impatience with questions that have been asked too often, its agile movement between skepticism and affirmation, its air of the workshop rather than the museum or the shrine."--Mary Lynn Johnson

„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.

Gebraucht kaufen

Zustand: Befriedigend
Pages can have notes/highlighting...
Diesen Artikel anzeigen

EUR 11,93 für den Versand von USA nach Deutschland

Versandziele, Kosten & Dauer

Weitere beliebte Ausgaben desselben Titels

9780822307921: Critical Paths: Blake and the Argument of Method

Vorgestellte Ausgabe

ISBN 10:  0822307928 ISBN 13:  9780822307921
Verlag: Duke University Press, 1987
Softcover

Suchergebnisse für Critical Paths: Blake and the Argument of Method

Beispielbild für diese ISBN

Miller, Dan; Miller
Verlag: Duke University Press, 1987
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: ThriftBooks-Dallas, Dallas, TX, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less 1.85. Bestandsnummer des Verkäufers G0822307510I3N00

Verkäufer kontaktieren

Gebraucht kaufen

EUR 13,06
Währung umrechnen
Versand: EUR 11,93
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Miller, D et al (eds)
Verlag: Duke University Press, 1987
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: Anybook.com, Lincoln, Vereinigtes Königreich

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,900grams, ISBN:0822307510. Bestandsnummer des Verkäufers 7097227

Verkäufer kontaktieren

Gebraucht kaufen

EUR 23,86
Währung umrechnen
Versand: EUR 6,39
Von Vereinigtes Königreich nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Miller Dan , Bracher Mark, and Ault Donald Editors
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover Erstausgabe

Anbieter: Ann Open Book, Lansing, MI, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: Very Good. Zustand des Schutzumschlags: Good. 1st Edition. Bestandsnummer des Verkäufers 012056

Verkäufer kontaktieren

Gebraucht kaufen

EUR 13,27
Währung umrechnen
Versand: EUR 34,36
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Miller, Dan, Mark Bracher, and Donald Ault
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: Bear Bookshop, John Greenberg, Brattleboro, VT, USA

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

382pp. 8vo Illustrated in black and white Brown cloth Nice clean tight bright copy: Near Fine/Near Fine dj 0-8223-0751-0. Bestandsnummer des Verkäufers 34070813

Verkäufer kontaktieren

Gebraucht kaufen

EUR 17,30
Währung umrechnen
Versand: EUR 38,22
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Miller, Dan; Mark Bracher, & Donald Ault
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: Bear Bookshop, John Greenberg, Brattleboro, VT, USA

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

382pp. 8vo Illustrated in black and white Brown cloth Near Fine/Near Fine dj 0-8223-0751-0. Bestandsnummer des Verkäufers 58052904

Verkäufer kontaktieren

Gebraucht kaufen

EUR 17,30
Währung umrechnen
Versand: EUR 38,22
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Miller, Dan, et al., Eds
ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: Hackenberg Booksellers ABAA, El Cerrito, CA, USA

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

xiv, 380p., b/w illus., dj. Bestandsnummer des Verkäufers 026682

Verkäufer kontaktieren

Gebraucht kaufen

EUR 22,12
Währung umrechnen
Versand: EUR 39,51
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

ISBN 10: 0822307510 ISBN 13: 9780822307518
Gebraucht Hardcover

Anbieter: Midtown Scholar Bookstore, Harrisburg, PA, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: Very Good. With very good dust jacket. Very Good hardcover with light shelfwear - NICE! Standard-sized. Bestandsnummer des Verkäufers mon0000051932

Verkäufer kontaktieren

Gebraucht kaufen

EUR 8,51
Währung umrechnen
Versand: EUR 64,38
Von USA nach Deutschland
Versandziele, Kosten & Dauer

Anzahl: 1 verfügbar

In den Warenkorb