Verwandte Artikel zu Main drainage works of the city of Boston (Massachusetts,...

Main drainage works of the city of Boston (Massachusetts, U.S.A.) - Softcover

 
9781231045312: Main drainage works of the city of Boston (Massachusetts, U.S.A.)
Alle Exemplare der Ausgabe mit dieser ISBN anzeigen:
 
 
Reseña del editor:
This historic book may have numerous typos and missing text. Purchasers can download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1885 Excerpt: ... and cylinder, also the surrounding clay and the bulkhead above, were in motion, settling slowly. By the time the shaft had been firmly founded on the rock the pile bulkhead had settled nearly five feet. After the shafts had been sunk and secured the excavation for the tunnel proper encountered no serious obstacles. The work was carried on at six different headings. From the middle and east shafts work progressed in both directions, and from the west shaft and the upper end of the incline at Squantum single headings were driven. The incline descends one foot vertical in six feet horizontal. At this point a heading was driven downwards for about 400 feet and then stopped, owing to the difficulty and expense of removing the water which accumulated at its face. At the middle shaft power drills, driven by compressed air, were used, and at other points hand drilling was employed. There was not much difference as to either expense or rapidity in the two methods. By either an advance of four feet was considered a fair day's work. The chief merit of the air drills seemed to be that they were not demoralized by pay-days, and never struck for higher wages. Various forms of nitro-glycerine were employed as explosives, and no casuality occurred through its use. The average diameter of the excavation (Plate XXI., Fig. 2) was about 10.2 feet, approximating very well to the 9.5 feet required to receive the final brick lining. The excavated material, amounting to about 25,000 yards in all, was deposited around the shafts, forming small islands. The maximum amount of water leaking into the tunnel at any time was 64,000 gallons an hour. The headings between the east and middle shafts met Jan. 24, 1882, and those between the middle and west shafts met June 22, 1882. Lining th...

„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.

  • VerlagRareBooksClub.com
  • Erscheinungsdatum2012
  • ISBN 10 1231045310
  • ISBN 13 9781231045312
  • EinbandTapa blanda
  • Anzahl der Seiten46

(Keine Angebote verfügbar)

Buch Finden:



Kaufgesuch aufgeben

Sie kennen Autor und Titel des Buches und finden es trotzdem nicht auf AbeBooks? Dann geben Sie einen Suchauftrag auf und wir informieren Sie automatisch, sobald das Buch verfügbar ist!

Kaufgesuch aufgeben

Weitere beliebte Ausgaben desselben Titels

9781332268665: Main Drainage Works of the City of Boston: Massachusetts, U. S. A (Classic Reprint)

Vorgestellte Ausgabe

ISBN 10:  1332268668 ISBN 13:  9781332268665
Verlag: Forgotten Books, 2018
Softcover

  • 9781358417566: Main Drainage Works of the City of Boston (Massachusetts, U.S.a.)

    Palala..., 2016
    Hardcover

  • 9781146468619: Main Drainage Works of the City of Boston

    Nabu P..., 2010
    Softcover

  • 9781289973438: Main Drainage Works of the City of Boston (Massachusetts, U.S.A.) - Primary Source Edition

    Nabu P..., 2013
    Softcover

  • 9781358214332: Main Drainage Works of the City of Boston (Massachusetts, U.S.a.)

    Palala..., 2016
    Hardcover

Beste Suchergebnisse bei AbeBooks