The National Military Strategy calls for U.S. forces to fight and win two nearly simultaneous major theater wars. Accordingly, the Army calculates its force structure requirements on the basis of this scenario. The strategy also calls for the Army to support operations in a series of concurrent contingencies and assumes that forces thus engaged will be withdrawn and redeployed if war occurs. The Army's difficulty in supporting contingency operations without repeatedly calling on some types of units has raised questions about whether forces structured to meet the two-war scenario can also support multiple peacetime contingency operations. GAO reviewed the Army's force planning process, known as Total Army Analysis 2007, to determine whether the Army's planned force structure will meet its contingency requirements. GAO found that the Army's force structure generally provides the number and types of units required to simultaneously carry out seven illustrative contingency operations requiring Army participation. However, it does not contain the number and types of units needed to meet the needs of five simultaneous contingencies lasting for more than six months and requiring force rotations. If Army forces continue to be called on to engage in such contingencies for long periods of time, it would seem prudent to have a force structure that is able to meet such needs.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
The National Military Strategy calls for U.S. forces to fight and win two nearly simultaneous major theater wars. Accordingly, the Army calculates its force structure requirements on the basis of this scenario. The strategy also calls for the Army to support operations in a series of concurrent contingencies and assumes that forces thus engaged will be withdrawn and redeployed if war occurs. The Army's difficulty in supporting contingency operations without repeatedly calling on some types of units has raised questions about whether forces structured to meet the two-war scenario can also support multiple peacetime contingency operations. GAO reviewed the Army's force planning process, known as Total Army Analysis 2007, to determine whether the Army's planned force structure will meet its contingency requirements. GAO found that the Army's force structure generally provides the number and types of units required to simultaneously carry out seven illustrative contingency operations requiring Army participation. However, it does not contain the number and types of units needed to meet the needs of five simultaneous contingencies lasting for more than six months and requiring force rotations. If Army forces continue to be called on to engage in such contingencies for long periods of time, it would seem prudent to have a force structure that is able to meet such needs.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: California Books, Miami, FL, USA
Zustand: New. Bestandsnummer des Verkäufers I-9781287233510
Anzahl: Mehr als 20 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand pp. 34. Bestandsnummer des Verkäufers 393609465
Anzahl: 4 verfügbar
Anbieter: Books Puddle, Woodside, NY, USA
Zustand: New. Print on Demand pp. 34. Bestandsnummer des Verkäufers 26385990438
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND pp. 34. Bestandsnummer des Verkäufers 18385990444
Anzahl: 4 verfügbar
Anbieter: THE SAINT BOOKSTORE, Southport, Vereinigtes Königreich
Paperback / softback. Zustand: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days. Bestandsnummer des Verkäufers C9781287233510
Anzahl: Mehr als 20 verfügbar