A project is a unique undertaking or endeavor to be accomplished that can be divided into individual subtasks or activities each of which requires time and scarce resources for its completion. Also there is a desired objective to be attained (for example, minimization of project duration or of variation of resource utilization, or maximization of net present value of the project). Moreover, there are given precedence relationships among activities prescrib ing the order in which activities must be carried out. Project scheduling, in its basic form, consists of finding start times for all activities such that pre scribed resource and precedence constraints are satisfied and an objective function is optimized. Since the concept of a project can be interpreted quite broadly, project scheduling problems arise in a great variety of practical situations. These in clude construction work, the development and introduction of new products, service systems, or software packages, strategic long-term planning in manu facturing and the service sector, emergency planning, and even the conduct ing of political campaigns. Recently, project scheduling has been successfully applied to production and operations management, e.g. make-to-order pro duction in manufacturing and batch production in process industries. Since the late 1950's, network-based planning methods for project sched uling problems have been developed, cf. Elmaghraby (1977) and Moder et al.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: CSG Onlinebuch GMBH, Darmstadt, Deutschland
Softcover. Zustand: Gut. Gebraucht - Gut Zustand: Gut, XI, 335 pp. About this book: The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, cost of resources purchased or rented, or variation of resource utilization over time. A structural analysis of the different project scheduling problems is given and many exact and heuristic solution procedures with detailed performance analysis are presented, which exploit the specific problem structure. Moreover, some interesting applications to make-to-order production and batch production in process industries are investigated. Written for researchers. Bestandsnummer des Verkäufers 16776
Anzahl: 1 verfügbar
Anbieter: Buchpark, Trebbin, Deutschland
Zustand: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Keine Beschreibung verfügbar. Bestandsnummer des Verkäufers 628954/202
Anzahl: 1 verfügbar
Anbieter: Mispah books, Redhill, SURRE, Vereinigtes Königreich
paperback. Zustand: Very Good. Very Good. Dust Jacket may NOT BE INCLUDED.CDs may be missing. SHIPS FROM MULTIPLE LOCATIONS. book. Bestandsnummer des Verkäufers ERICA82935404246363
Anzahl: 1 verfügbar