Through this book an attempt has been made to cover lean implementation issues such as customers pressure,organization constraints, implementation hurdles, training required for lean implementation, commitment and awareness of employees about lean implementation, suppliers issues, design variables for lean implementation, process variables for lean implementation, lean tools, various waste identified, performance parameters and investment priorities for lean implementation in Indian scenario. With the help of a case study reduction in work in- process inventory by 80.09%, finished goods inventory by 50%, product lead time by 82.12%, station cycle time by 3.75%, change over time by 6.75% and manpower required by 16.66%. Finally a leanness measurement instrument called leanness index was developed and leanness of auto component Indian industry was measured. Both the results of the case study and value of leanness index were found as per the lean implementation status given by the survey conducted in Indian industries. The findings given by this research will be very useful for the managers and practitioner working for lean implementation in India environment.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Jeto perwaq kniga awtora. On poluchil stepen' magistra prawa, kwalifikaciü UGC/JRF i w nastoqschee wremq gotowitsq k zaschite doktorskoj dissertacii w oblasti intellektual'noj sobstwennosti. On wsegda proqwlql zhiwoj interes k nauke, uchastwowal w razlichnyh nacional'nyh i mezhdunarodnyh seminarah, konferenciqh, master-klassah i byl awtorom rqda statej i nauchnyh rabot. V nastoqschee wremq on rabotaet üristom w indijskoj korporacii POWERGRID.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Through this book an attempt has been made to cover lean implementation issues such as customers pressure,organization constraints, implementation hurdles, training required for lean implementation, commitment and awareness of employees about lean implementation, suppliers issues, design variables for lean implementation, process variables for lean implementation, lean tools, various waste identified, performance parameters and investment priorities for lean implementation in Indian scenario. With the help of a case study reduction in work in- process inventory by 80.09%, finished goods inventory by 50%, product lead time by 82.12%, station cycle time by 3.75%, change over time by 6.75% and manpower required by 16.66%. Finally a leanness measurement instrument called leanness index was developed and leanness of auto component Indian industry was measured. Both the results of the case study and value of leanness index were found as per the lean implementation status given by the survey conducted in Indian industries. The findings given by this research will be very useful for the managers and practitioner working for lean implementation in India environment. 220 pp. Englisch. Bestandsnummer des Verkäufers 9783659828812
Anzahl: 2 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Singh BhimBhim Singh is a professor of Mechanical Engineering. He holds a PhD Degree in lean Manufacturing and having a rich experience of teaching, research and administration. He has published papers in various journals of repute a. Bestandsnummer des Verkäufers 511944710
Anzahl: Mehr als 20 verfügbar
Anbieter: Books Puddle, New York, NY, USA
Zustand: New. Bestandsnummer des Verkäufers 26394690496
Anzahl: 4 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand. Bestandsnummer des Verkäufers 401719327
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND. Bestandsnummer des Verkäufers 18394690506
Anzahl: 4 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Lean Implementation Issues: An Indian Perspective | Lean Implementation Road-Map | Bhim Singh | Taschenbuch | Englisch | 2016 | LAP LAMBERT Academic Publishing | EAN 9783659828812 | Verantwortliche Person für die EU: LAP Lambert Academic Publishing, Brivibas Gatve 197, 1039 RIGA, LETTLAND, customerservice[at]vdm-vsg[dot]de | Anbieter: preigu Print on Demand. Bestandsnummer des Verkäufers 113180275
Anzahl: 5 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Through this book an attempt has been made to cover lean implementation issues such as customers pressure,organization constraints, implementation hurdles, training required for lean implementation, commitment and awareness of employees about lean implementation, suppliers issues, design variables for lean implementation, process variables for lean implementation, lean tools, various waste identified, performance parameters and investment priorities for lean implementation in Indian scenario. With the help of a case study reduction in work in- process inventory by 80.09%, finished goods inventory by 50%, product lead time by 82.12%, station cycle time by 3.75%, change over time by 6.75% and manpower required by 16.66%. Finally a leanness measurement instrument called leanness index was developed and leanness of auto component Indian industry was measured. Both the results of the case study and value of leanness index were found as per the lean implementation status given by the survey conducted in Indian industries. The findings given by this research will be very useful for the managers and practitioner working for lean implementation in India environment.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 220 pp. Englisch. Bestandsnummer des Verkäufers 9783659828812
Anzahl: 1 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Through this book an attempt has been made to cover lean implementation issues such as customers pressure,organization constraints, implementation hurdles, training required for lean implementation, commitment and awareness of employees about lean implementation, suppliers issues, design variables for lean implementation, process variables for lean implementation, lean tools, various waste identified, performance parameters and investment priorities for lean implementation in Indian scenario. With the help of a case study reduction in work in- process inventory by 80.09%, finished goods inventory by 50%, product lead time by 82.12%, station cycle time by 3.75%, change over time by 6.75% and manpower required by 16.66%. Finally a leanness measurement instrument called leanness index was developed and leanness of auto component Indian industry was measured. Both the results of the case study and value of leanness index were found as per the lean implementation status given by the survey conducted in Indian industries. The findings given by this research will be very useful for the managers and practitioner working for lean implementation in India environment. Bestandsnummer des Verkäufers 9783659828812
Anzahl: 1 verfügbar