Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Temesgen Tegabu, BSc, M.Sc: Studied Civil Engineering at Addis Ababa University, Ethiopia. Presently Claim Expert at DOHWA-IPE-MCE JV Consulting Engr. for Industrial Park Construction Projects in A.A. Also Fdr & GM at FORTRESS Eng. Consultants Plc.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process. 232 pp. Englisch. Bestandsnummer des Verkäufers 9783659964671
Anzahl: 2 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Tegabu TemesgenTemesgen Tegabu, BSc, M.Sc: Studied Civil Engineering at Addis Ababa University, Ethiopia. Presently Claim Expert at DOHWA-IPE-MCE JV Consulting Engr. for Industrial Park Construction Projects in A.A. Also Fdr & GM at . Bestandsnummer des Verkäufers 255955837
Anzahl: Mehr als 20 verfügbar
Anbieter: Books Puddle, New York, NY, USA
Zustand: New. Bestandsnummer des Verkäufers 26394748421
Anzahl: 4 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand. Bestandsnummer des Verkäufers 401661402
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND. Bestandsnummer des Verkäufers 18394748431
Anzahl: 4 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process. Bestandsnummer des Verkäufers 9783659964671
Anzahl: 1 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 232 pp. Englisch. Bestandsnummer des Verkäufers 9783659964671
Anzahl: 1 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. ROW Risk Management of Road Construction Projects in Urban Areas | A Case Study of Addis Ababa, Ethiopia | Temesgen Tegabu | Taschenbuch | 232 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9783659964671 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu. Bestandsnummer des Verkäufers 114955124
Anzahl: 5 verfügbar