1: Introduction.- 2: Description of the Problems.- 3: Classification of Schedules.- 4: Characterisation and Generation of Instances.- 5: The Single-Mode Project Scheduling Problem.- 6: The Multi-Mode Project Scheduling Problem.- 7: Project Scheduling with Given Deadline.- 8: Project Scheduling with Setup Times.- 9: Applications to Production Management.- 10: Concluding Remarks.- List of Notations.- List of Abbreviations.- References.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: Chiron Media, Wallingford, Vereinigtes Königreich
PF. Zustand: New. This item is printed on demand. Brand new book, sourced directly from publisher. Dispatch time is 6-7 days from our warehouse. Book will be sent in robust, secure packaging to ensure it reaches you securely. Bestandsnummer des Verkäufers 6666-IUK-9783790808292
Anzahl: 20 verfügbar
Anbieter: GreatBookPrices, Columbia, MD, USA
Zustand: As New. Unread book in perfect condition. Bestandsnummer des Verkäufers 21297794
Anzahl: 15 verfügbar
Anbieter: GreatBookPrices, Columbia, MD, USA
Zustand: New. Bestandsnummer des Verkäufers 21297794-n
Anzahl: 15 verfügbar
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This book is the result of my research perfonned at the University Kiel under the supervision of Professor Dr. Andreas Drexl. I am very grateful to him for suggesting the subject as well as for his guidance and support during the preparation. Professor Dr. Klaus Brockhoff deserves thanks for under taking the task of the secondary assessment. The Institut fur Betriebswirtschaftslehre in Kiel and especially my col leagues Dr. Knut Haase, Carsten Jordan, AlfKimrns, and Dr. Frank Salewski provided a stimulating environment. Particularly, I am indebted to Dr. Arno Sprecher and Andreas Schinner. The results of Chapter 2 and 3, respectively, are outcome of joint research with Arno; Andreas proof-read the entire manuscript. Furthennore, I would like to express my gratitude to Prof. Dr. Erik Demeulemeester, Prof Dr. James H. Patterson, Prof Dr. Roman Slowinski, and Prof Dr. Ramon Alvarez-Valdes for the valuable help they provided with suggestions, papers, and computer programs. I, As to the technical realisation of this book, lowe thanks to Reimer Karlsen for coding and impl~menting parts of the algorithms, to Marc Schumann for drawing all figures, to Ina Kantowski who looked after the literature, and to Uwe Penke for providing a ready-to-use computer-laboratory. The gratitude that I feel towards my family requires no further comments. 212 pp. Englisch. Bestandsnummer des Verkäufers 9783790808292
Anzahl: 2 verfügbar
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
Zustand: New. In English. Bestandsnummer des Verkäufers ria9783790808292_new
Anzahl: Mehr als 20 verfügbar
Anbieter: Books Puddle, Woodside, NY, USA
Zustand: New. pp. 224. Bestandsnummer des Verkäufers 26101429087
Anzahl: 4 verfügbar
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Paperback. Zustand: Brand New. 1995 edition. 224 pages. 9.25x6.00x0.50 inches. In Stock. Bestandsnummer des Verkäufers x-3790808296
Anzahl: 2 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand pp. 224 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam. Bestandsnummer des Verkäufers 108793984
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND pp. 224. Bestandsnummer des Verkäufers 18101429077
Anzahl: 4 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. 1: Introduction.- 2: Description of the Problems.- 3: Classification of Schedules.- 4: Characterisation and Generation of Instances.- 5: The Single-Mode Project Scheduling Problem.- 6: The Multi-Mode Project Scheduling Problem.- 7: Project Scheduling with G. Bestandsnummer des Verkäufers 5309911
Anzahl: Mehr als 20 verfügbar