EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta region of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Sylvester Efe Owhojeta é Surveyor Registado, Membro do Instituto Nigeriano de Topógrafos e Membro do Instituto de Consultores de Gestão. Licenciado com B.Sc. em Topografia, Geodesia e Fotogrametria e obteve o Mestrado em Economia do Petróleo. Apresentou diferentes trabalhos técnicos na semana de trabalho do FIG.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta region of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide. 56 pp. Englisch. Bestandsnummer des Verkäufers 9786139828319
Anzahl: 2 verfügbar
Anbieter: Books Puddle, New York, NY, USA
Zustand: New. Bestandsnummer des Verkäufers 26377306687
Anzahl: 4 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand. Bestandsnummer des Verkäufers 369787360
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND. Bestandsnummer des Verkäufers 18377306677
Anzahl: 4 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta region of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide. Bestandsnummer des Verkäufers 9786139828319
Anzahl: 1 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Owhojeta Sylvester EfeSylvester Efe Owhojeta is a Registered Surveyor, Member of the Nigerian Institution of Surveyors and Fellow of the Institute of Management Consultants. Graduated with B.Sc. degree in Surveying, Geodesy and Photo. Bestandsnummer des Verkäufers 385873043
Anzahl: Mehr als 20 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta region of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 56 pp. Englisch. Bestandsnummer des Verkäufers 9786139828319
Anzahl: 1 verfügbar
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Early Production System (EPS) Barge Movement | Installation at Olero Creek Production Platform, Benin River Area | Sylvester Efe Owhojeta | Taschenbuch | 56 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786139828319 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu. Bestandsnummer des Verkäufers 113923814
Anzahl: 5 verfügbar