In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing¿ is the most successful tool to provide optimal solution in any production scenario. ¿There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Prof. Dr. R. Pugazhenthi is currently working as a Professor in Department of Mechanical Engineering, VITAS, Chennai, India. He was awarded doctorate in Mechanical Engineering at VIT University, Vellore in 2015. He has published 30 research articles in Peer Reviewed Journals, 24 in International Conferences and 10 Mechanical Engineering Text Books.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing is the most successful tool to provide optimal solution in any production scenario. There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound. 192 pp. Englisch. Bestandsnummer des Verkäufers 9786139896837
Anzahl: 2 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Pugazhenthi R.Prof. Dr. R. Pugazhenthi is currently working as a Professor in Department of Mechanical Engineering, VITAS, Chennai, India. He was awarded doctorate in Mechanical Engineering at VIT University, Vellore in 2015. He has . Bestandsnummer des Verkäufers 385876353
Anzahl: Mehr als 20 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing¿ is the most successful tool to provide optimal solution in any production scenario. ¿There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 192 pp. Englisch. Bestandsnummer des Verkäufers 9786139896837
Anzahl: 1 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing is the most successful tool to provide optimal solution in any production scenario. There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound. Bestandsnummer des Verkäufers 9786139896837
Anzahl: 1 verfügbar
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
Paperback. Zustand: Brand New. 192 pages. 8.66x5.91x0.44 inches. In Stock. Bestandsnummer des Verkäufers zk6139896835
Anzahl: 1 verfügbar