Congestion management is one of the most important issues for secure and reliable system operations in deregulated electricity market. This work presents an optimization approach for optimal allocation and optimal sizing of Thyristor Controlled Series Compensator (TCSC) or Unified Power Flow Controller (UPFC) in deregulated electricity market to reduce congestion. The proposed optimization technique has been used with an objective to minimize overall operating cost, maximize social welfare by placing TCSC or UPFC in a suitable location. In order to reduce the solution space two effective Indices (Marginal Congestion Index (MCI) and Active Power Spot Price Index (APSPI)) are employed for optimal placement of TCSC or UPFC. Once the location of TCSC or UPFC is identified, the optimal parameters of TCSC or UPFC are also determined. The proposed approach is carried out on modified IEEE 14-bus and IEEE 118-bus test systems and the results are presented to validate the approach.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Dr. Dawn has completed his M.Tech & Ph.D. from NIT Silchar, India in Power and Energy Systems Engineering. He has published many research papers in reputed International Journals/Conferences in the field of Power System. His research interest are in Power System Economics, Congestion Management, Power System Planning, Smart Grid, etc.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Congestion management is one of the most important issues for secure and reliable system operations in deregulated electricity market. This work presents an optimization approach for optimal allocation and optimal sizing of Thyristor Controlled Series Compensator (TCSC) or Unified Power Flow Controller (UPFC) in deregulated electricity market to reduce congestion. The proposed optimization technique has been used with an objective to minimize overall operating cost, maximize social welfare by placing TCSC or UPFC in a suitable location. In order to reduce the solution space two effective Indices (Marginal Congestion Index (MCI) and Active Power Spot Price Index (APSPI)) are employed for optimal placement of TCSC or UPFC. Once the location of TCSC or UPFC is identified, the optimal parameters of TCSC or UPFC are also determined. The proposed approach is carried out on modified IEEE 14-bus and IEEE 118-bus test systems and the results are presented to validate the approach. 104 pp. Englisch. Bestandsnummer des Verkäufers 9786202672412
Anzahl: 2 verfügbar
Anbieter: Books Puddle, New York, NY, USA
Zustand: New. Bestandsnummer des Verkäufers 26386791893
Anzahl: 4 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Dawn SubhojitDr. Dawn has completed his M.Tech & Ph.D. from NIT Silchar, India in Power and Energy Systems Engineering. He has published many research papers in reputed International Journals/Conferences in the field of Power System. Bestandsnummer des Verkäufers 494630696
Anzahl: Mehr als 20 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. Print on Demand. Bestandsnummer des Verkäufers 393889290
Anzahl: 4 verfügbar
Anbieter: Biblios, Frankfurt am main, HESSE, Deutschland
Zustand: New. PRINT ON DEMAND. Bestandsnummer des Verkäufers 18386791903
Anzahl: 4 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Congestion management is one of the most important issues for secure and reliable system operations in deregulated electricity market. This work presents an optimization approach for optimal allocation and optimal sizing of Thyristor Controlled Series Compensator (TCSC) or Unified Power Flow Controller (UPFC) in deregulated electricity market to reduce congestion. The proposed optimization technique has been used with an objective to minimize overall operating cost, maximize social welfare by placing TCSC or UPFC in a suitable location. In order to reduce the solution space two effective Indices (Marginal Congestion Index (MCI) and Active Power Spot Price Index (APSPI)) are employed for optimal placement of TCSC or UPFC. Once the location of TCSC or UPFC is identified, the optimal parameters of TCSC or UPFC are also determined. The proposed approach is carried out on modified IEEE 14-bus and IEEE 118-bus test systems and the results are presented to validate the approach.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 104 pp. Englisch. Bestandsnummer des Verkäufers 9786202672412
Anzahl: 1 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Congestion management is one of the most important issues for secure and reliable system operations in deregulated electricity market. This work presents an optimization approach for optimal allocation and optimal sizing of Thyristor Controlled Series Compensator (TCSC) or Unified Power Flow Controller (UPFC) in deregulated electricity market to reduce congestion. The proposed optimization technique has been used with an objective to minimize overall operating cost, maximize social welfare by placing TCSC or UPFC in a suitable location. In order to reduce the solution space two effective Indices (Marginal Congestion Index (MCI) and Active Power Spot Price Index (APSPI)) are employed for optimal placement of TCSC or UPFC. Once the location of TCSC or UPFC is identified, the optimal parameters of TCSC or UPFC are also determined. The proposed approach is carried out on modified IEEE 14-bus and IEEE 118-bus test systems and the results are presented to validate the approach. Bestandsnummer des Verkäufers 9786202672412
Anzahl: 1 verfügbar