As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
EUR 23,00 für den Versand von Deutschland nach USA
Versandziele, Kosten & DauerAnbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. 88 pp. Englisch. Bestandsnummer des Verkäufers 9786204206752
Anzahl: 2 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Zaini Muhammad ArulMy name is Muhammad Arul Zaini, I was born on 9th September 1996 in Indonesia. Since a child I was educated and living far from my parents until I graduated and got a master s degree in engineering. I have dedicate. Bestandsnummer des Verkäufers 519630314
Anzahl: Mehr als 20 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.Books on Demand GmbH, Überseering 33, 22297 Hamburg 88 pp. Englisch. Bestandsnummer des Verkäufers 9786204206752
Anzahl: 2 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. Bestandsnummer des Verkäufers 9786204206752
Anzahl: 1 verfügbar