GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Gratis für den Versand innerhalb von/der Deutschland
Versandziele, Kosten & DauerAnbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Bajaj RohitDr. Rohit Bajaj is working as Associate Professor in Chandigarh University and has a keen interest towards innovation and research. He has filed four patents currently in the Grant Phase. He has published his articles in a. Bestandsnummer des Verkäufers 877798509
Anzahl: Mehr als 20 verfügbar
Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschland
Taschenbuch. Zustand: Neu. Neuware -GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.Books on Demand GmbH, Überseering 33, 22297 Hamburg 84 pp. Englisch. Bestandsnummer des Verkäufers 9786206157960
Anzahl: 2 verfügbar
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates. 84 pp. Englisch. Bestandsnummer des Verkäufers 9786206157960
Anzahl: 2 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates. Bestandsnummer des Verkäufers 9786206157960
Anzahl: 1 verfügbar