Anbieter: liu xing, Nanjing, JS, China
Hardcover. Zustand: New. Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.HardCover Pub Date: 2003 07 Pages: 654 Language: Chinese in Publisher: Atomic Energy Press Ling Ao Nuclear Power Engineering Practice and Innovation: civil construction volume equipment installation volume is divided into six parts: the nuclear island and civil construction of power plant ancillary facilities Conventional Island civil construction and power station auxiliary facilities. marine civil works construction. equipment installation of the nuclear island. conventional island equipment installation. power plants and supporting facilities and equipment installation. Contents: civil construction volume Preface 1 nuclear island and civil construction of power plant ancillary facilities look through the comparison and analysis of the civil construction of the Ling Ao Nuclear Power independent of management practice civil construction of the Ling Ao Nuclear Power management autonomy in decision-making processes in civil engineering program management civil engineering quality management nuclear Island and supporting facilities of the nuclear island late civil works construction and installation coordination and management of civil construction non-conformities statistical analysis of the nuclear island stainless steel lining external quality control engineering quality common problem of civil faced concrete nuclear island raft foundation concrete crack control nuclear island reinforced concrete analysis Lining civil engineering materials of carbon steel part of the end of the analysis of the construction of the nuclear island construction ride hanging group layout selection and safety management the ring hanging the corbel welding and heat treatment after the nuclear island plant caulking protection frustum fillet weld ultrasound localization explore the shielding concrete conventional island and civil construction of the power plant ancillary facilities of the conventional island of the technical management of the civil works nonconformance management and corrective (preventive) measures Conventional Island civil engineering planning and duration control items procurement control and localization work 950MW steam the 1st turbine generator turbine generator base construction base does not meet the entry processing and No.2 Generator base construction turbine generator bolt casing pressure grouting reinforced concrete frame structure of the main plant construction on the 2nd main plant main steel erection of artificial digging pile construction circulating water culverts template design and construction of the main plant main plant anti whip girder lifting the the conventional island ventilation and air conditioning engineering construction rock foundation excavation of controlled blasting of the younger age of concrete without destroying the circulating water culvert concrete cracks control pumping station (PX) flared. template installation and dismantling pump volute influent channel the preparation of three-dimensional reinforced concrete crack control technology engineering civil construction in marine projects aqueduct structure breakwater twist 3 sea king word block prefabricated and placed in septal embankment Ground Wall construction experience installation Preface 1 nuclear island equipment installation conventional island equipment installation 3 power plant ancillary facilities and equipment installedFour Satisfaction guaranteed,or money back. Bestandsnummer des Verkäufers NE001778
Anzahl: 1 verfügbar