Modular delivery promises a faster route to a working facility, and on the right project it delivers exactly that. What it does not do is remove coordination risk. It relocates it — into the seam between the factory floor and the site, a handoff that conventional construction protocols were never designed to watch.
That seam is where the expensive failures live. A gasket substituted on the factory floor for sound reasons that nobody thought to report. A design change that reached the site team but never reached the fabricator. A truck journey nobody instrumented. A module that passed every test it was given, and still could not hold dew point once installed.
None of these require an incompetent party or a defective module. Every fabricator delivered a product that passed its own quality checks. The cost accumulated in the handoffs around them.
Written by a chartered quantity surveyor with thirty years across four countries, this is a practitioner's field manual for the cost and coordination gaps that modular delivery introduces into cleanrooms, dry rooms, battery plants, semiconductor fabs, and data centre power and cooling skids.
Three composite case studies — a battery dry room, semiconductor cleanroom pods, and data centre power and cooling skids — trace nine coordination failures from cause to invoice, with the cost and schedule consequences reconciled in full.
Includes a complete field guide appendix: audit checklists, contract clause language, a receiving readiness checklist, the four-state gating framework, and a failure-mode quick reference you can take onto a live project.
For quantity surveyors, cost managers, project controls professionals, commissioning agents, owner's representatives, and anyone accountable for a facility that arrives on a truck.
Part of the Cost Management Professional Series.
Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.
Anbieter: California Books, Miami, FL, USA
Zustand: New. Print on Demand. Bestandsnummer des Verkäufers I-9798192747957
Anzahl: Mehr als 20 verfügbar
Anbieter: PBShop.store UK, Fairford, GLOS, Vereinigtes Königreich
PAP. Zustand: New. New Book. Shipped from UK. Established seller since 2000. Bestandsnummer des Verkäufers L2-9798192747957
Anzahl: Mehr als 20 verfügbar
Anbieter: CitiRetail, Stevenage, Vereinigtes Königreich
Paperback. Zustand: new. Paperback. Modules arrive finished. The coordination risk arrives with them.Modular delivery promises a faster route to a working facility, and on the right project it delivers exactly that. What it does not do is remove coordination risk. It relocates it - into the seam between the factory floor and the site, a handoff that conventional construction protocols were never designed to watch.That seam is where the expensive failures live. A gasket substituted on the factory floor for sound reasons that nobody thought to report. A design change that reached the site team but never reached the fabricator. A truck journey nobody instrumented. A module that passed every test it was given, and still could not hold dew point once installed.None of these require an incompetent party or a defective module. Every fabricator delivered a product that passed its own quality checks. The cost accumulated in the handoffs around them.Written by a chartered quantity surveyor with thirty years across four countries, this is a practitioner's field manual for the cost and coordination gaps that modular delivery introduces into cleanrooms, dry rooms, battery plants, semiconductor fabs, and data centre power and cooling skids.Inside, you will find: The factory qualification audit - what to ask a fabricator about change discipline before you sign, and what the answers tell youEnvironmental factory acceptance testing - why a passed FAT proves less than it appears to, and what a report must state that it cannot verifyThe factory boundary freeze - the date a design change stops being a drawing revision and becomes a production-line changeTransportation as a construction activity - shock and vibration logging, and the risk transfer point most contracts leave undefinedFour-state staged re-qualification - factory-verified, transport-cleared, site-integrated, environmentally re-qualified, and why skipping to the last one is the costliest shortcut in modular deliveryModule interface registers - the fields a conventional register has no reason to carry, including cumulative tolerance trackingTotal delivered cost - why factory price is a real number and a poor proxy, and what routinely sits between the twoPermitting a building that does not yet exist in the jurisdiction's eyes - statutory super load lead times and the authority that has never reviewed a moduleThree composite case studies - a battery dry room, semiconductor cleanroom pods, and data centre power and cooling skids - trace nine coordination failures from cause to invoice, with the cost and schedule consequences reconciled in full.Includes a complete field guide appendix: audit checklists, contract clause language, a receiving readiness checklist, the four-state gating framework, and a failure-mode quick reference you can take onto a live project.For quantity surveyors, cost managers, project controls professionals, commissioning agents, owner's representatives, and anyone accountable for a facility that arrives on a truck.Part of the Cost Management Professional Series. This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Bestandsnummer des Verkäufers 9798192747957
Anzahl: 1 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. Neuware. Bestandsnummer des Verkäufers 9798192747957
Anzahl: 2 verfügbar