Ageing of Built Infrastructure
Frank Collins
Verkauft von Books Puddle, New York, NY, USA
AbeBooks-Verkäufer seit 22. November 2018
Neu - Hardcover
Zustand: Neu
Versand innerhalb von USA
Anzahl: 3 verfügbar
In den Warenkorb legenVerkauft von Books Puddle, New York, NY, USA
AbeBooks-Verkäufer seit 22. November 2018
Zustand: Neu
Anzahl: 3 verfügbar
In den Warenkorb legenpp. 240.
Bestandsnummer des Verkäufers 2698200080
The book addresses the problem of ageing infrastructure and how ageing can reduce the service life below expected levels. The rate of ageing is affected by the type of construction material, environmental exposure, function of the infrastructure, and loading: each of these factors is considered in the assessment of ageing. How do international design codes address ageing? Predictive models of ageing behaviour are available and the different types (empirical, deterministic, and probabilistic) are discussed in a whole-of-life context. Life cycle plans, initiated at the design stage, can ensure that the design life is met, while optimising the management of the asset: reducing life cycle costs and reducing the environmental footprint due to less maintenance/remediation interventions and fewer unplanned stoppages and delays. Health monitoring of infrastructure can be conducted via implanted probes (wired or wireless) or by non-destructive testing that can routinely measure the durability, loading, and exposure environments at key locations around the facility. Routine monitoring can trigger preventative maintenance that can extend the life of the infrastructure and minimise unplanned and reactive remediation, while also providing ongoing data that can be utilised towards more durable future construction. Future infrastructure will need to be safe and durable, financially and environmentally sustainable over the lifecycle, thereby raising socio-economic wellbeing. The book concludes by discussing the key impacting factors that will need to be addressed. The author brings a strong academic and industry background to present a resource for academics and practitioners wishing to address the ageing of built infrastructure.
Professor Frank Collins
Professor Frank Collins is the Director of the Australian Centre for Infrastructure Durability (ACID). His role involves fostering collaboration between universities to streamline access by government and industry to the most relevant researchers and facilities for the durability of built infrastructure. Prior to his academic career, Frank’s has had 19 years as a chartered professional engineer, which gives him a unique perspective on ageing of infrastructure. He worked for 13 years with Taywood Engineering Ltd in their London, Hong Kong, Sydney and Melbourne offices; involved with diagnosis and rehabilitation of infrastructure and applications of construction materials. In 1988, Frank was Lead Materials Engineer in the Sydney Opera House rehabilitation program which entailed diagnosis of the roof shell elements and substructure, and development of remedial and preventative maintenance works. In 1995, he established the Bridge Testing and Rehabilitation Unit within the Ministry of Transport, Vietnam, allowing the Ministry to become self-sufficient in the management of bridge assets. While technical director at AECOM (Maunsell) he established and managed the company’s Advanced Materials Group, including technical and commercial leadership, and provided high-level advice on many international infrastructure projects.
As an academic since 2006, he has taken akeen research interest in the areas of durability and ageing of built infrastructure; utilisation of wastes as alternative construction materials; and improved construction materials for durable and stronger infrastructure.
Dr Frederic Blin
Frédéric has over 18 years’ experience as an engineer and is the leader of AECOM’s Strategic Asset Management and Advanced Materials team in Victoria, Tasmania and South Australia. He has worked across industries (properties/facilities, transport and water) and brings a solid understanding of the importance of balancing asset lifecycle risks and costs to provide desired service levels to customers. He holds a materials engineering degree and a PHD in corrosion engineering.
At AECOM, Frédéric is a Technical Director, who has worked on and led numerous projects in the field of asset management and durability/materials engineering. This has included the provision of technical support at the design, build, finance (including due diligences) and operation & maintain phases of the lifecycle of (particularly infrastructure-based) assets (e.g. parks, tunnels, ports, plants, buildings, roads and bridges).
Frédéric’s experience include condition and performance monitoring and evaluation, risk management and lifecycle decision frameworks and tools, maintenance and renewals forecasting as well as asset management business improvement.
„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.
We accept return for those books which are received damamged. Though we take appropriate care in packaing to avoid such situation.
Wenn Sie Verbraucher sind, können Sie gemäß den folgenden Bestimmungen vom Vertrag zurücktreten. Verbraucher ist jede natürliche Person, die zu Zwecken handelt, die nicht ihrer kaufmännischen, gewerblichen, künstlerischen oder beruflichen Tätigkeit zugerechnet werden können.
Informationen zum Widerrufsrecht
Gesetzliches Widerrufsrecht
Sie haben das Recht, den Vertrag innerhalb von 14 Tagen ohne Angabe von Gründen zu widerrufen.
Die Widerrufsfrist beträgt 14 Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht der Transporteur ist, die letzte Ware oder den letzten Posten oder das letzte Exemplar in Besitz genommen hat.
Um das Widerrufsrecht auszuüben, füllen Sie auf unserer Website unter „Meine Einkäufe" in „Mein Nutzerkonto" eine eindeutige Erklärung elektronisch aus und senden Sie sie ab. Wir werden Ihnen unverzüglich eine Bestätigung über den Eingang eines solchen Widerrufs auf einem dauerhaften Datenträger (z. B. per E-Mail) übermitteln.
Um die Widerrufsfrist einzuhalten, reicht es aus, dass Sie Ihre Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Auswirkungen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, erstatten wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die entstehen, wenn Sie eine andere Art der Lieferung als die von uns angebotene günstigste Standardlieferung gewählt haben).
Wir können einen Abzug von der Rückerstattung für den Wertverlust der gelieferten Waren vornehmen, wenn der Verlust auf eine unnötige Behandlung durch Sie zurückzuführen ist.
Wir werden die Rückerstattung unverzüglich und nicht später als 14 Tage nach dem Tag vornehmen, an dem wir über Ihre Entscheidung, diesen Vertrag zu widerrufen, informiert wurden.
Für die Rückerstattung verwenden wir dasselbe Zahlungsmittel, das Sie für die ursprüngliche Transaktion verwendet haben, es sei denn, Sie haben ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen aufgrund einer solchen Rückerstattung Gebühren berechnet.
Wir können die Rückzahlung verweigern, bis wir die Waren wieder zurückerhalten haben oder Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, was eher eintritt.
Sie müssen die Waren unverzüglich und in jedem Fall spätestens 14 Tage ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrags unterrichten, an Books Puddle, New York, New York, U.S.A., zurücksenden oder übergeben. Die Frist ist eingehalten, wenn Sie die Ware vor Ablauf der Frist von 14 Tagen zurücksenden. Sie müssen die direkten Kosten der Rücksendung der Waren tragen. Sie haften nur für einen etwaigen Wertverlust der Waren, der auf eine Behandlung zurückzuführen ist, die nicht zur Prüfung der Art, Eigenschaften und Funktionsweise der Waren erforderlich ist.
Ausnahmen vom Widerrufsrecht
Das Widerrufsrecht gilt nicht für:
| Bestellmenge | 12 bis 19 Werktage | 12 bis 14 Werktage |
|---|---|---|
| Erster Artikel | EUR 3.46 | EUR 6.05 |
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.