Verkäufer
PBShop.store UK, Fairford, GLOS, Vereinigtes Königreich
Verkäuferbewertung 4 von 5 Sternen
Heritage Bookseller
AbeBooks-Mitglied seit 1996
New Book. Shipped from UK. Established seller since 2000. Bestandsnummer des Verkäufers FW-9781119428398
A practical treatise on the processes and standards required for the effective time management of major construction projects
This book uses logical step-by-step procedures and examples from inception and risk appraisal―through design and construction to testing and commissioning―to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion.
Guide to Good Practice in the Management of Time in Major Projects―Dynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling.
Guide to Good Practice in the Management of Time in Major Projects―Dynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants.
Über die Autorin bzw. den Autor:
The Chartered Institute of Building is at the heart of a management career in construction. It is the world's largest and most influential professional body for construction management and leadership, with a Royal Charter to promote the science and practice of building and construction for the benefit of society. With over 46,000 members worldwide, the CIOB is the international voice of the building professional.
Titel: Guide to Good Practice in the Management of ...
Verlag: Wiley
Erscheinungsdatum: 2018
Einband: PAP
Zustand: New
Auflage: 2. Auflage
Anbieter: THE SAINT BOOKSTORE, Southport, Vereinigtes Königreich
Paperback / softback. Zustand: New. New copy - Usually dispatched within 4 working days. Bestandsnummer des Verkäufers B9781119428398
Anzahl: Mehr als 20 verfügbar
Anbieter: CitiRetail, Stevenage, Vereinigtes Königreich
Paperback. Zustand: new. Paperback. A practical treatise on the processes and standards required for the effective time management of major construction projects This book uses logical step-by-step procedures and examples from inception and risk appraisalthrough design and construction to testing and commissioningto show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion. Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling. Provides guidance for the strategic management of time in construction and civil engineering projectsDemonstrates how to use a dynamic time model to manage time pro-actively in building and civil engineering projectsSets out processes and standards to be achieved ensuring systematic documentation and quality control of time managementIntegrates with the CIOB major projects contract Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Bestandsnummer des Verkäufers 9781119428398
Anzahl: 1 verfügbar
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
Zustand: New. pp. 248. Bestandsnummer des Verkäufers 370518614
Anzahl: 3 verfügbar
Anbieter: Grand Eagle Retail, Bensenville, IL, USA
Paperback. Zustand: new. Paperback. A practical treatise on the processes and standards required for the effective time management of major construction projects This book uses logical step-by-step procedures and examples from inception and risk appraisalthrough design and construction to testing and commissioningto show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion. Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling. Provides guidance for the strategic management of time in construction and civil engineering projectsDemonstrates how to use a dynamic time model to manage time pro-actively in building and civil engineering projectsSets out processes and standards to be achieved ensuring systematic documentation and quality control of time managementIntegrates with the CIOB major projects contract Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Bestandsnummer des Verkäufers 9781119428398
Anbieter: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Irland
Zustand: New. 2018. 2nd Edition. Paperback. . . . . . Bestandsnummer des Verkäufers V9781119428398
Anzahl: Mehr als 20 verfügbar
Anbieter: Books Puddle, New York, NY, USA
Zustand: New. pp. 248. Bestandsnummer des Verkäufers 26375526793
Anzahl: 3 verfügbar
Anbieter: Kennys Bookstore, Olney, MD, USA
Zustand: New. 2018. 2nd Edition. Paperback. . . . . . Books ship from the US and Ireland. Bestandsnummer des Verkäufers V9781119428398
Anzahl: Mehr als 20 verfügbar
Anbieter: AussieBookSeller, Truganina, VIC, Australien
Paperback. Zustand: new. Paperback. A practical treatise on the processes and standards required for the effective time management of major construction projects This book uses logical step-by-step procedures and examples from inception and risk appraisalthrough design and construction to testing and commissioningto show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion. Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition features new appendices covering matters such as complexity in construction and engineering projects, productivity guides (including specific references to the UK, Australia, and the USA), and a number of case studies dealing with strategic time management and high-density, resource-based scheduling. Provides guidance for the strategic management of time in construction and civil engineering projectsDemonstrates how to use a dynamic time model to manage time pro-actively in building and civil engineering projectsSets out processes and standards to be achieved ensuring systematic documentation and quality control of time managementIntegrates with the CIOB major projects contract Guide to Good Practice in the Management of Time in Major ProjectsDynamic Time Modelling, 2nd Edition is an ideal handbook for project and program management professionals working on civil engineering and construction projects, including those from contractors, clients, and project management consultants. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability. Bestandsnummer des Verkäufers 9781119428398
Anzahl: 1 verfügbar