Highway construction supervision Practical Manual [Paperback]
Verlag: People's Communications Press, 2000
- Softcover
- Neu

Anbieter: liu xing, Nanjing, JS, Chinaliu xing
Verkäufer:in bei AbeBooks seit 7. April 2009
Zustand: Neu
EUR 76,93
- Banküberweisung
- PayPal
Anzahl: 1 verfügbar
In den WarenkorbArtikelbeschreibung des Verkäufers
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback Pages Number: 266 Publisher.: Communications Press; 1st edition (June 1. 2004). The book has nine chapters. two of the points up and down on the article focuses on the supervision of the organization. responsibilities. systems and quality schedule. cost. three control. detailed supervision program; next cited the roadbed. road surface. bridge engineering data to fill in the standard sample. The book is available for highway construction. supervision and construction management. engineering and technical personnel for reference. Contents: duties on Section II of the first chapter of the Commissioner of the organization and responsibilities of Section I Supervision Organization at all levels of supervision organization section III of the responsibilities of supervisors at all levels supervision system section II of Section 1 Pro management site meetings three of section V of supervision reporting system for the fourth quarter supervision records and file management system clinical management files to and from the block diagram of the third section I of the quality supervision of quality control overview of the subgrade of Section II procedures and methods of Section III Section 4 Pavement Engineering Section V structure works in section VI drilling bridge structure of the column section VII. section VIII. road appendages section IX of the tunnel engineering section X of the progress of works supervision test work procedures to control the first section an overview of the Section 2 project schedule section V of the extension of section IV of the three program management procedures Contract Management and Cost Control Section I project started in section III of Section II design file transfer and tell smb. what one's real intentions are procedures for measurement and payment procedures and suspend the approval process to change the design procedure in section VI Claims Procedure Annex I: the establishment of attachment of the supervision plan: tenders as a whole started preparation of the report Annex III: embankment compaction test program example Annex IV: Engineering Quality Inspection Report annex V: Supervision of the program Annex VI: completion of final accounts report The next sixth data compilation complete description of individual projects started to apply to fill in the sample The first documentation to fill out Section 2 single project starts to apply to fill out the example of Chapter VII of the subgrade information to fill out the standard example of Section 1 units. the quality of part project Check the assessment form to fill out Section II of the standard sample Subgrade Earthwork data to fill in Section III of the standard sample culvert engineering data to fill in the standard example of the fourth quarter bridges engineering data to fill in the standard sample of Chapter VIII of the road project supervision information fill out section I of the standard sample unit. sub- project quality inspection and evaluation form to fill out Section II of the standard example of road engineering information to fill in the ninth chapter of the standard example of bridge engineering supervision information to fill out the standard example of Section 1 unit. segment quality inspection and assessment form to fill out section II of the standard example of foundation and substructure engineering data to fill in the standard example of Section III superstructure fabrication and installation of engineering data to fill in the standard example of the fourth quarter overall superstructure and deck construction information to fill out the standard sampleFour Satisfaction guaranteed,or money back.…
Bestandsnummer des Verkäufers MM1845
- Titel
- Highway construction supervision Practical Manual [Paperback]
- Autor
- BEN SHE.YI MING
- Verlag
- People's Communications Press
- Erscheinungsjahr
- 2000
- Zustand
- New
- Einband
- paperback
- ISBN-10
- 7114042930
- ISBN-13
- 9787114042935
„Inhaltsangabe“ gehört möglicherweise zu einer anderen Auflage dieses Titels.
liu xing
Nanjing, JS, China
Verkäufer:in bei AbeBooks seit 7. April 2009
Versandkosten von China nach USA
| Artikel | 16 bis 30 Werktage | 8 bis 16 Werktage |
|---|---|---|
| Erster Artikel | EUR 16,10 | EUR 26,83 |
Shopbeschreibung
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Spezialisierung
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesUnternehmensdaten der Verkäuferin bzw. des Verkäufers
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
JS, China
Verkaufsbedingungen
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Widerrufsrecht
Wenn Sie Verbraucher sind, können Sie gemäß den folgenden Bestimmungen vom Vertrag zurücktreten. Verbraucher ist jede natürliche Person, die zu Zwecken handelt, die nicht ihrer kaufmännischen, gewerblichen, künstlerischen oder beruflichen Tätigkeit zugerechnet werden können.
Informationen zum Widerrufsrecht
Gesetzliches Widerrufsrecht
Sie haben das Recht, den Vertrag innerhalb von 14 Tagen ohne Angabe von Gründen zu widerrufen.
Die Widerrufsfrist beträgt 14 Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht der Transporteur ist, die letzte Ware oder den letzten Posten oder das letzte Exemplar in Besitz genommen hat.
Um das Widerrufsrecht auszuüben, füllen Sie auf unserer Website unter „Meine Einkäufe" in „Mein Nutzerkonto" eine eindeutige Erklärung elektronisch aus und senden Sie sie ab. Wir werden Ihnen unverzüglich eine Bestätigung über den Eingang eines solchen Widerrufs auf einem dauerhaften Datenträger (z. B. per E-Mail) übermitteln.
Um die Widerrufsfrist einzuhalten, reicht es aus, dass Sie Ihre Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Auswirkungen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, erstatten wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die entstehen, wenn Sie eine andere Art der Lieferung als die von uns angebotene günstigste Standardlieferung gewählt haben).
Wir können einen Abzug von der Rückerstattung für den Wertverlust der gelieferten Waren vornehmen, wenn der Verlust auf eine unnötige Behandlung durch Sie zurückzuführen ist.
Wir werden die Rückerstattung unverzüglich und nicht später als 14 Tage nach dem Tag vornehmen, an dem wir über Ihre Entscheidung, diesen Vertrag zu widerrufen, informiert wurden.
Für die Rückerstattung verwenden wir dasselbe Zahlungsmittel, das Sie für die ursprüngliche Transaktion verwendet haben, es sei denn, Sie haben ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen aufgrund einer solchen Rückerstattung Gebühren berechnet.
Wir können die Rückzahlung verweigern, bis wir die Waren wieder zurückerhalten haben oder Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, was eher eintritt.
Sie müssen die Waren unverzüglich und in jedem Fall spätestens 14 Tage ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrags unterrichten, an liu xing, Nanjing, JS, China, zurücksenden oder übergeben. Die Frist ist eingehalten, wenn Sie die Ware vor Ablauf der Frist von 14 Tagen zurücksenden. Sie müssen die direkten Kosten der Rücksendung der Waren tragen. Sie haften nur für einen etwaigen Wertverlust der Waren, der auf eine Behandlung zurückzuführen ist, die nicht zur Prüfung der Art, Eigenschaften und Funktionsweise der Waren erforderlich ist.
Ausnahmen vom Widerrufsrecht
Das Widerrufsrecht gilt nicht für:
- Die Lieferung von Zeitungen, Zeitschriften oder Magazinen mit Ausnahme von Abonnementverträgen; und
- Die Lieferung digitaler Inhalte, die nicht auf einem physischen Medium (z. B. auf einer CD oder DVD) geliefert werden, wenn Sie bei Ihrer Bestellung akzeptiert haben, dass wir mit der Lieferung beginnen können und dass Sie nach Beginn der Lieferung den Vertrag nicht mehr widerrufen können.
Versandbedingungen
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.