Learning from the textbook: large boiler operation(Chinese Edition)

Sprache: Chinesisch

Verlag: China Electric Power Press, 2000

780125497X / 9787801254979

Anbieter: liu xing, Nanjing, JS, Chinaliu xing

Verkäufer/-in mit 5 Sternen

AbeBooks-Verkäufer/-in seit 7. April 2009

Artikel dieses Verkäufers ansehen
Softcover

Zustand: Neu

EUR 42,64

EUR 15,52 Versand 
Versand von China nach USA
Vom Verkäufer akzeptierte Zahlungsmethoden
  • Banküberweisung
  • PayPal

Anzahl: 1 verfügbar

In den Warenkorb
Kostenlose Rückgaben innerhalb von 30 Tagen
Möchten Sie mit Ihrer Kreditkarte bezahlen?
  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
Auf AbeBooks.com kaufen

Artikelbeschreibung vom Verkäufer

Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 1998 05 of Pages: 235 Publisher: China Electric Power Press Learning from the textbook: large boiler running focuses on the basic principle and practicality. not only about the large-scale natural circulation boiler. controlled circulation boilers. once-through boiler burning coal run the basic principle of the powder boiler startup. shutdown. normal operation. but also on the characteristics of large boilers. coordination control and safety protection of new technology to do a proper introduction. Learning from the textbook: large boiler operation colleges heat power engineering undergraduate textbooks. but also can be used as the Workers' University. of correspondence teaching materials. also available to run in thermal power plants. design and engineering and technical personnel start debugging reference. Contents: Section II of the large power plant boilers Overview Preface Chapter Section I boiler capacity parameters and cycle ways typical boiler section III automatic control of boiler startup and shutdown Section I Overview Chapter II boiler startup and outage safety economy start with the outage of the third quarter of Section 2 Power Unit heating surface during startup security System Section II drum boiler start the fourth quarter to start the process of combustion conditions Chapter drum boiler start first section starts with stopping Section III of the shipping process steam drum the start stress the fourth quarter pot water circulation pump automatically run Section V Embarkation process steam temperature and water level in Section VI shipment of the condition and wash silicon process sodas Chapter DC boiler start the first section once-through boiler start characteristics Section II Boiler Start bypass system the basic procedures of Section III DC boiler Kai outage Section IV Boiler Start conditions of normal operation of the first section of the fifth chapter of the drum boiler Overview Section II boiler state parameter monitoring requirements section static characteristics of the fourth quarter of section V of the dynamic characteristics of state parameter adjustment static characteristics of the sixth chapter of the DC characteristics and adjust the characteristics of the boiler status parameters Section 1 Section II of the dynamic characteristics of the third quarter to adjust the characteristics of Chapter VII of the milling system start and stop and transported economical operation in the fourth quarter of milling system common fault line first milling system start and stop the running of the second milling system to adjust the third quarter pulverizing system and deal with Chapter VIII of the boiler combustion control and regulation Section I pulverized coal burner ignition furnace Cause of Explosion in section II. and the prevention of section IV of the measures in the third quarter furnace safety supervisory system boiler combustion regulation automatically adjusts the combustion section V. Chapter large capacity thermal power peaking first transformer run advantages and disadvantages of Section II of Chapter 10 of the transformer to run the boiler running unit unit load to adjust the load adjustment method in section II of Section 1 Power Unit Power Unit Load Control System Section III unit unit run controlFour Satisfaction guaranteed,or money back.

Bestandsnummer des Verkäufers NE003652

Bibliografische Details

Titel
Learning from the textbook: large boiler operation(Chinese Edition)
Autor
JIN WEI QIANG
Verlag
China Electric Power Press
Veröffentlichungsjahr
2000
Zustand
New
Einband
paperback
Sprache
Chinesisch
ISBN-10
780125497X
ISBN-13
9787801254979

liu xing

Nanjing, JS, China

Verkäufer/-in mit 5 Sternen

AbeBooks-Verkäufer/-in seit 7. April 2009

Versandkosten von China nach USA

Artikel16 bis 30 Werktage8 bis 16 Werktage
Erster ArtikelEUR 15,52EUR 25,86
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.

Zahlungsarten

Bei AbeBooks.com können Sie mit Ihrer Kreditkarte bezahlen.
  • Banküberweisung
  • PayPal

Shop-Beschreibung

Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!

Spezialisierung

Chemistry, Mathematics, Computer, Physics, Environment, Social Sciences

Unternehmensdaten der Verkäuferin bzw. des Verkäufers

NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN

Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100