Verkäufer
BooksRun, Philadelphia, PA, USA
Verkäuferbewertung 5 von 5 Sternen
AbeBooks-Verkäufer seit 2. Februar 2016
Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported. Bestandsnummer des Verkäufers 0471721883-8-1
A complete toolkit for implementation of Earned Value Management
Performance-Based Earned Value uniquely shows project managers how to effectively integrate technical, schedule, and cost objectives by improving earned value management (EVM) practices. Providing innovative guidelines, methods, examples, and templates consistent with capability models and standards, this book approaches EVM from a practical level with understandable techniques that are applicable to the management of any project.
Clear and unambiguous instructions explain how to incorporate EVM with key systems engineering, software engineering, and project management processes such as establishing the technical or quality baseline, requirements management, using product metrics, and meeting success criteria for technical reviews. Detailed information is included on linking product requirements, project work products, the project plan, and the Performance Measurement Baseline (PMB), as well as correlating technical performance measures (TPM) with EVM. With straightforward instructions on how to use EVM on a simple project, such as building a house, and on complex projects, such as high-risk IT and engineering development projects, it is the only book that includes excerpts from the PMI®'s Project Management Body of Knowledge (PMBOK®), CMMI, the EVM System standard, systems engineering standards, federal acquisition regulations, and Department of Defense guides.
Performance-Based Earned Value allows both novices and experienced project managers, including project manager of suppliers and customers in the commercial and government sectors; software and systems engineering process improvement leaders; CMMI appraisers; PMI members; and IEEE Computer Society members to:
Written by Paul Solomon and Ralph Young, internationally recognized industry experts, Performance-Based Earned Value is constructed from guidance in standards and capability models for EVM, systems engineering, software engineering, and project management. It is the complete guide to EVM, invaluable in helping students prepare for the PMI®-PMP® exam with practical examples and templates to facilitate understanding, and in guiding project professionals in the private and public sectors to use EVM on complex projects.
(PMI, PMBOK, PMP, and Project Management Professional are registered marks of the Project Management Institute, Inc.)
Über die Autorin bzw. den Autor:
PAUL J. SOLOMON, PMP, is an internationally known consultant and author on Earned Value Management (EVM), and founder of his firm, Performance-Based Earned Value®. Mr. Solomon led the use of EVM on programs at Northrop Grumman Corporation, including the B-2 Stealth Bomber and the F-35 Joint Strike Fighter. He is a coauthor of EVM standards, including the national standard, ANSI/EIA-748 (for which he received the U.S. Department of Defense David Packard Excellence in Acquisition Award) and the PMI Practice Standard for EVM. He was a visiting scientist at the Software Engineering Institute (SEI) and wrote an SEI report on CMMI® and EVM. Mr. Solomon frequently speaks at industry and government conferences and is a tutor concerning EVM, systems engineering, and software engineering in the U.S. and India.
RALPH R. YOUNG, DBA, is Director of Engineering Process Improvement, Systems and Process Engineering, Defense Group at Northrop Grumman Information Technology. Dr. Young helped lead his former business unit (Litton PRC) to CMM Level 5 and his current business unit to CMMI® Level 5. Northrop Grumman Corporation's Defense Group was the first organization in the world to be evaluated a second time at CMMI® Level 5. Dr. Young supports continuous improvement for both internal and external projects, to make process improvements, implement effective requirements practices, and develop innovations to facilitate project management.
Titel: Performance-Based Earned Value
Verlag: Wiley-IEEE Computer Society Pr (edition 1)
Erscheinungsdatum: 2006
Einband: Paperback
Zustand: Very Good
Auflage: 1.
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Very Good. Former library book; may include library markings. Used book that is in excellent condition. May show signs of wear or have minor defects. Bestandsnummer des Verkäufers 55237883-6
Anzahl: 1 verfügbar
Anbieter: Better World Books, Mishawaka, IN, USA
Zustand: Very Good. Used book that is in excellent condition. May show signs of wear or have minor defects. Bestandsnummer des Verkäufers 16451994-6
Anzahl: 1 verfügbar
Anbieter: Aspen Book Co., Denver, CO, USA
Zustand: good. A well-loved companion. Corners and cover might show a little wear, and you could find some notes or highlights. The dust jacket might be MIA, it might have been a library book and extras aren't guaranteedâ"but the story's all there! Bestandsnummer des Verkäufers PKV.0471721883.G
Anzahl: 1 verfügbar
Anbieter: ThriftBooks-Dallas, Dallas, TX, USA
Paperback. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less. Bestandsnummer des Verkäufers G0471721883I4N00
Anzahl: 1 verfügbar
Anbieter: ThriftBooks-Atlanta, AUSTELL, GA, USA
Paperback. Zustand: Fair. No Jacket. Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less. Bestandsnummer des Verkäufers G0471721883I5N00
Anzahl: 1 verfügbar
Anbieter: Vulkaneifel Bücher, Birgel, Deutschland
Paperback. Zustand: Sehr gut. Leichte Druckstelle auf der Covervorderseite, kleine Lagerspuren am Buch, Inhalt einwandfrei und ungelesen 233065 Sprache: Englisch Gewicht in Gramm: 570. Bestandsnummer des Verkäufers 384924
Anzahl: 1 verfügbar
Anbieter: GreatBookPrices, Columbia, MD, USA
Zustand: New. Bestandsnummer des Verkäufers 3187885-n
Anzahl: 1 verfügbar
Anbieter: INDOO, Avenel, NJ, USA
Zustand: New. Brand New. Bestandsnummer des Verkäufers 9780471721888
Anzahl: Mehr als 20 verfügbar
Anbieter: GreatBookPrices, Columbia, MD, USA
Zustand: As New. Unread book in perfect condition. Bestandsnummer des Verkäufers 3187885
Anzahl: 1 verfügbar
Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich
Zustand: As New. Unread book in perfect condition. Bestandsnummer des Verkäufers 3187885
Anzahl: Mehr als 20 verfügbar