Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)

Sprache: Englisch

Verlag: IWA Publishing, London, 2004

1843397161 / 9781843397168

Anbieter: AussieBookSeller, Truganina, VIC, AustralienAussieBookSeller

Verkäufer/-in mit 5 Sternen

Verkäufer:in bei AbeBooks seit 22. Juni 2007

Softcover

Zustand: Neu

EUR 271,74

EUR 33,04 Versand 
Versand von Australien nach USA

Anzahl: 1 verfügbar

In den Warenkorb
30 Tage kostenlose Rückgabe

Artikelbeschreibung des Verkäufers

Paperback. Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their 'asset base'. Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance.Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Phase 1 also involves establishment of protocols for whole-life costs and performance data for BMPs and SUDS. Protocols for whole-life costs will be published separately. An additional outcome of Phase 1 will be the selection of a limited number of BMPs and SUDS authorities or sites for qualitative or quantitative monitoring and further assessment during Phase 2.As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability.…

Bestandsnummer des Verkäufers 9781843397168

Titel
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs (Paperback)
Autor
L.K. Lampe
Verlag
IWA Publishing, London
Erscheinungsjahr
2004
Zustand
new
Einband
Paperback
Sprache
Englisch
ISBN-10
1843397161
ISBN-13
9781843397168

AussieBookSeller

Truganina, VIC, Australien

Verkäufer/-in mit 5 Sternen

Verkäufer:in bei AbeBooks seit 22. Juni 2007

Versandkosten von Australien nach USA

Artikel25 bis 45 Werktage8 bis 14 Werktage
Erster ArtikelEUR 33,04EUR 39,28
Die Versandzeiten werden von den Verkäuferinnen und Verkäufern festgelegt. Sie variieren je nach Versanddienstleister und Standort. Sendungen, die den Zoll passieren, können Verzögerungen unterliegen. Eventuell anfallende Abgaben oder Gebühren sind von der Käuferin bzw. dem Käufer zu tragen. Die Verkäuferin bzw. der Verkäufer kann Sie bezüglich zusätzlicher Versandkosten kontaktieren, um einen möglichen Anstieg der Versandkosten für Ihre Artikel auszugleichen.

Zahlungsarten

  • Visa
  • Mastercard
  • American Express
  • Carte Bleue
  • Apple Pay
  • Google Pay

Unternehmensdaten der Verkäuferin bzw. des Verkäufers

The Nile Group Pty Ltd

42 Apex Drive
Truganina, VIC Australien 3029