Programme Procurement in Construction: Learning from London 2012
Sprache: Englisch
Verlag: Wiley-Blackwell, 2013
- Softcover
- Neu

Anbieter: Ubiquity Trade, Miami, FL, USAUbiquity Trade
AbeBooks-Verkäufer/-in seit 4. Januar 2012
Zustand: Neu
EUR 91,89
Anzahl: Mehr als 20 verfügbar
In den WarenkorbArtikelbeschreibung vom Verkäufer
Brand new! Please provide a physical shipping address.
Bestandsnummer des Verkäufers 9780470674734
- Titel
- Programme Procurement in Construction: Learning from London 2012
- Autor
- Mead, John; Gruneberg, Stephen
- Verlag
- Wiley-Blackwell
- Veröffentlichungsjahr
- 2013
- Zustand
- New
- Einband
- Softcover
- Sprache
- Englisch
- ISBN-10
- 0470674733
- ISBN-13
- 9780470674734
"This book ... adds to the impressive 'legacy' of learning which is still emerging from the successful delivery of the London 2012 construction programme. The authors combine the reforming zeal of a champion for change, who was there every step of the way, with academic rigour, and the result is delivered with impressive passion and commitment to the topic … All spenders and suppliers need to read this, to understand how conventional understandings of procurement fall so dramatically short when applied to high value-high risk acquisitions, which invariably is what large construction projects represent."
―Don Ward, Chief Executive, Constructing Excellence, UK
Successful construction is often attributed to one or more aspects of the delivery process from good planning, design and clever engineering to efficient project management and quality construction. Before any of these disciplines can begin, they all require some form of procurement to select the team or supply chain to meet a client’s or a project’s specific requirements. The concept of PSE - Purchase and Supplier Engineering - originated in the procurement of the construction and infrastructure required to stage the 30th Olympiad in London during 2012. At the time of writing PSE has successfully delivered almost £25bn of public procurement meeting client and project requirements and without legal challenge.
The construction of the venues and infrastructure needed to stage London 2012 was such a resounding success that it boosted not only the reputation of the UK construction industry but also the confidence of the UK population in the country’s ability to organise, build and run a major international event. Its success has been lauded as something from which clients and industry could learn. The ODA has established a comprehensive and informative body of evidence as part of a Learning Legacy. While the ODA is well aware of the many elements of the procurement and supply chain management, the complete end to end concept of how the Olympic supply chain procurements were managed has until now not been captured.
For example, how does one buy the stage for an Olympic Games? How does one manage the details of thousands of contracts and the many firms of contractors, subcontractors and material suppliers and ensure that no one organisation adversely affects any other to the detriment of the programme? How are a client’s requirements beyond those of the capital asset realised as part of the investment? How does one measure programme exposure, or manage performance? How does one measure capacity and the ability of firms to cope with the work and manage the risks involved?
Programme Procurement in Construction: Learning from London 2012 covers the planning and preparation of a programme’s procurement processes from understanding and developing the client’s requirements, to monitoring performance based on the benchmarks contractors set out in their own tender submissions. The emphasis is on a close attention to detail to avoid surprises, while keeping a focus on the total programme. Purchase and Supplier Engineering provides an overview of managing the interest of firms in participating and the resulting capacity and workloads of all suppliers, including the main contractors and the critical subcontractors and material suppliers.
Offering techniques, tips and lessons learnt from the implementation of PSE on London 2012 and Crossrail, this book is aimed at public and private sector clients, developers, senior management and those businesses and professionals involved in undertaking the procurement, supply chain management and delivery of multiple construction projects or complex major construction programmes.
„Inhaltsangabe“ gehört möglicherweise zu einer anderen Auflage dieses Titels.
Über die Autorin bzw. den Autor
John Mead, Director, Davis Langdon
30 years of experience working at all levels within the construction sector, including on site as a trade contractor, in project management, policy development for the Construction Industry Council and with the Movement for Innovation (M4I). And for the last 8 years within construction consultancy specialising in supply chain management.
He is a Director at Davis Langdon, an AECOM Company and works within the Program Management team leading the supply chain management function for a number of clients, programs and projects.
John currently divides his time between the Supply Chain Management function for the Olympic Delivery Authority for the delivery of the infrastructure for the London 2012 Olympic and Paralympic Games. A project which until recently he led for over 3 years and the Crossrail programme where he is taking the strategy and implementation he developed and delivered for ODA and is now implementing on this program.
John has captured the learning from his previous roles including the success achieved for ODA and now being delivered for Crossrail, and has developed the Purchase and Supplier Engineering service which forms part of the Davis Langdon Program Management.
Stephen Gruneberg, Reader, University of Westminster
Visiting Fellow, Faculty of the Built Environment, Northumbria University, and Teaching Fellow, (Part-time), Development Planning Unit, Bartlett School, UCL.
Publications include: (2008) Construction and Property Markets in a Changing World Economy in Les Ruddock (ed) Economics for the Modern Built Environment, Taylor and Francis (2000) The Economics of the Modern Construction Sector, (with G Ive), Macmillan (2000)The Economics of the Modern Construction Firm, (with G Ive), Macmillan, (2000) The Building Industry and the Building Process. in Knox P., and Ozolins P., Design Professionals and the Built Environment, John Wiley, USA, (1997) Construction Economics; an introduction, Macmillan.
„Über diesen Titel“ gehört möglicherweise zu einer anderen Auflage dieses Titels.
Ubiquity Trade
Miami, FL, USA
AbeBooks-Verkäufer/-in seit 4. Januar 2012
Versandkosten innerhalb von USA
| Artikel | 5 bis 14 Werktage | 3 bis 6 Werktage |
|---|---|---|
| Erster Artikel | EUR 2,58 | EUR 4,74 |
Zahlungsarten
- PayPal
Shop-Beschreibung
Established in 2010, Ubiquity Trade is an online procurement entity offering merchandise in a variety of industries, including books, media, education materials, and more. All merchandise is shipped brand-new from various facilities across the continental USA.
Unternehmensdaten der Verkäuferin bzw. des Verkäufers
Ubiquity Trade
FL, USA
Verkaufsbedingungen
We guarantee the condition of every book as it's described on the Abebooks web sites. If
you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the
order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery
date. If you've changed your mind about a book that you've ordered, please use the Ask
bookseller a question link to contact us and we'll respond within 2 business days.
Palexbooks
54391 Village Center Drive
No 53
Idyllwild, CA 92549
service@palexbooks.com
1-609-712-6235
Contact: Paul Alexander
Widerrufsrecht
Wenn Sie Verbraucher sind, können Sie gemäß den folgenden Bestimmungen vom Vertrag zurücktreten. Verbraucher ist jede natürliche Person, die zu Zwecken handelt, die nicht ihrer kaufmännischen, gewerblichen, künstlerischen oder beruflichen Tätigkeit zugerechnet werden können.
Informationen zum Widerrufsrecht
Gesetzliches Widerrufsrecht
Sie haben das Recht, den Vertrag innerhalb von 14 Tagen ohne Angabe von Gründen zu widerrufen.
Die Widerrufsfrist beträgt 14 Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht der Transporteur ist, die letzte Ware oder den letzten Posten oder das letzte Exemplar in Besitz genommen hat.
Um das Widerrufsrecht auszuüben, füllen Sie auf unserer Website unter „Meine Einkäufe" in „Mein Nutzerkonto" eine eindeutige Erklärung elektronisch aus und senden Sie sie ab. Wir werden Ihnen unverzüglich eine Bestätigung über den Eingang eines solchen Widerrufs auf einem dauerhaften Datenträger (z. B. per E-Mail) übermitteln.
Um die Widerrufsfrist einzuhalten, reicht es aus, dass Sie Ihre Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Auswirkungen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, erstatten wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die entstehen, wenn Sie eine andere Art der Lieferung als die von uns angebotene günstigste Standardlieferung gewählt haben).
Wir können einen Abzug von der Rückerstattung für den Wertverlust der gelieferten Waren vornehmen, wenn der Verlust auf eine unnötige Behandlung durch Sie zurückzuführen ist.
Wir werden die Rückerstattung unverzüglich und nicht später als 14 Tage nach dem Tag vornehmen, an dem wir über Ihre Entscheidung, diesen Vertrag zu widerrufen, informiert wurden.
Für die Rückerstattung verwenden wir dasselbe Zahlungsmittel, das Sie für die ursprüngliche Transaktion verwendet haben, es sei denn, Sie haben ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen aufgrund einer solchen Rückerstattung Gebühren berechnet.
Wir können die Rückzahlung verweigern, bis wir die Waren wieder zurückerhalten haben oder Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, was eher eintritt.
Sie müssen die Waren unverzüglich und in jedem Fall spätestens 14 Tage ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrags unterrichten, an Ubiquity Trade, Miami, Florida, U.S.A., zurücksenden oder übergeben. Die Frist ist eingehalten, wenn Sie die Ware vor Ablauf der Frist von 14 Tagen zurücksenden. Sie müssen die direkten Kosten der Rücksendung der Waren tragen. Sie haften nur für einen etwaigen Wertverlust der Waren, der auf eine Behandlung zurückzuführen ist, die nicht zur Prüfung der Art, Eigenschaften und Funktionsweise der Waren erforderlich ist.
Ausnahmen vom Widerrufsrecht
Das Widerrufsrecht gilt nicht für:
- Die Lieferung von Zeitungen, Zeitschriften oder Magazinen mit Ausnahme von Abonnementverträgen; und
- Die Lieferung digitaler Inhalte, die nicht auf einem physischen Medium (z. B. auf einer CD oder DVD) geliefert werden, wenn Sie bei Ihrer Bestellung akzeptiert haben, dass wir mit der Lieferung beginnen können und dass Sie nach Beginn der Lieferung den Vertrag nicht mehr widerrufen können.
Versandbedingungen
Orders usually ship within 3 business days.