Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Artigues

ISBN 10: 1848210345 ISBN 13: 9781848210349
Verlag: ISTE Ltd and John Wiley & Sons Inc, 2008
Neu Hardcover

Verkäufer Kennys Bookstore, Olney, MD, USA Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

AbeBooks-Verkäufer seit 9. Oktober 2009


Beschreibung

Beschreibung:

Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Editor(s): Artigues, Christian; Demassey, Sophie; Neron, Emmanuel. Series: ISTE. Num Pages: 288 pages, Illustrations. BIC Classification: KJMV5. Category: (UP) Postgraduate, Research & Scholarly. Dimension: 238 x 164 x 22. Weight in Grams: 612. . 2008. 1st Edition. Hardcover. . . . . Books ship from the US and Ireland. Bestandsnummer des Verkäufers V9781848210349

Diesen Artikel melden

Inhaltsangabe:

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Über die Autorin bzw. den Autor: Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

„Über diesen Titel“ kann sich auf eine andere Ausgabe dieses Titels beziehen.

Bibliografische Details

Titel: Resource-Constrained Project Scheduling: ...
Verlag: ISTE Ltd and John Wiley & Sons Inc
Erscheinungsdatum: 2008
Einband: Hardcover
Zustand: New

Beste Suchergebnisse bei AbeBooks

Beispielbild für diese ISBN

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Verlag: Wiley-Blackwell, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: New Book Sale, London, Vereinigtes Königreich

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: New. Usually Dispatched within 1-2 Business Days , Buy with confidence , excellent customer service. Bestandsnummer des Verkäufers 1848210345--A29

Verkäufer kontaktieren

Neu kaufen

EUR 41,06
EUR 56,94 shipping
Versand von Vereinigtes Königreich nach USA

Anzahl: 1 verfügbar

In den Warenkorb

Foto des Verkäufers

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Verlag: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: GreatBookPrices, Columbia, MD, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: New. Bestandsnummer des Verkäufers 5510716-n

Verkäufer kontaktieren

Neu kaufen

EUR 141,74
EUR 2,25 shipping
Versand innerhalb von USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Verlag: John Wiley and Sons, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: INDOO, Avenel, NJ, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: New. Brand New. Bestandsnummer des Verkäufers 9781848210349

Verkäufer kontaktieren

Neu kaufen

EUR 144,06
Versand gratis
Versand innerhalb von USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Foto des Verkäufers

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Verlag: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Gebraucht Hardcover

Anbieter: GreatBookPrices, Columbia, MD, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: As New. Unread book in perfect condition. Bestandsnummer des Verkäufers 5510716

Verkäufer kontaktieren

Gebraucht kaufen

EUR 163,09
EUR 2,25 shipping
Versand innerhalb von USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Foto des Verkäufers

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Verlag: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Gebraucht Hardcover

Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: As New. Unread book in perfect condition. Bestandsnummer des Verkäufers 5510716

Verkäufer kontaktieren

Gebraucht kaufen

EUR 169,35
EUR 17,08 shipping
Versand von Vereinigtes Königreich nach USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover Erstausgabe

Anbieter: Grand Eagle Retail, Bensenville, IL, USA

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Bestandsnummer des Verkäufers 9781848210349

Verkäufer kontaktieren

Neu kaufen

EUR 184,18
Versand gratis
Versand innerhalb von USA

Anzahl: 1 verfügbar

In den Warenkorb

Foto des Verkäufers

Artigues, Christian
Verlag: ISTE LTD, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: moluna, Greven, Deutschland

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Gebunden. Zustand: New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence const. Bestandsnummer des Verkäufers 597090960

Verkäufer kontaktieren

Neu kaufen

EUR 191,11
EUR 48,99 shipping
Versand von Deutschland nach USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Foto des Verkäufers

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Verlag: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: New. Bestandsnummer des Verkäufers 5510716-n

Verkäufer kontaktieren

Neu kaufen

EUR 201,00
EUR 17,08 shipping
Versand von Vereinigtes Königreich nach USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Verlag: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover

Anbieter: Ubiquity Trade, Miami, FL, USA

Verkäuferbewertung 4 von 5 Sternen 4 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Zustand: New. Brand new! Please provide a physical shipping address. Bestandsnummer des Verkäufers 9781848210349

Verkäufer kontaktieren

Neu kaufen

EUR 207,95
EUR 2,55 shipping
Versand innerhalb von USA

Anzahl: Mehr als 20 verfügbar

In den Warenkorb

Beispielbild für diese ISBN

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Neu Hardcover Erstausgabe

Anbieter: AussieBookSeller, Truganina, VIC, Australien

Verkäuferbewertung 5 von 5 Sternen 5 Sterne, Erfahren Sie mehr über Verkäufer-Bewertungen

Hardcover. Zustand: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability. Bestandsnummer des Verkäufers 9781848210349

Verkäufer kontaktieren

Neu kaufen

EUR 293,38
EUR 31,51 shipping
Versand von Australien nach USA

Anzahl: 1 verfügbar

In den Warenkorb