Anbieter: liu xing, Nanjing, JS, China
EUR 132,51
Währung umrechnenAnzahl: 1 verfügbar
In den Warenkorbpaperback. Zustand: New. Language:Chinese.Paperback. Pub Date: 2022-12 Publisher: Petroleum Industry: This book systematically introduces the deep gas well flow assurance technology system through the summary of the deep gas well flow assurance technology in the Tarim Oilfield. including the mechanism of blockage formation. experimental analysis technology. prediction mathematical model and other mechanism research. as well as mature blockage prevention and control technology. to help readers quickly understand how d.
ISBN 10: 7512138695 ISBN 13: 9787512138698
Anbieter: liu xing, Nanjing, JS, China
EUR 88,56
Währung umrechnenAnzahl: 3 verfügbar
In den Warenkorbpaperback. Zustand: New. Paperback. Pub Date: 2019-03-01 Pages: 218 Language: Chinese Publisher: Beijing Jiaotong University Press Locomotive On-board Safety Equipment / General Higher Education Thirteenth Five-Year Planning TextbookRailway Transportation takes typical work tasks as Drive. integrate common locomotive on-board safety equipment [including track circuit and locomotive signals. LKJ2000 train operation monitoring and recording device. TAX2 locomotive safety information integrated monitoring device. locomo.