Isbn: 9783540578345 - resource-constrained project scheduling: exact methods for the multi-mode case (lecture notes in economics and mathematical systems, 409, band 409) (15 Ergebnisse)

ISBN
Mit der Detailsuche verfeinern

Optimieren Sie Ihre Suche

  • Bücher (15)

bis

Benutzerdefinierte Preisspanne (EUR)

bis

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: -OnTimeBooks-, Phoenix, AZ, USA-OnTimeBooks-

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Gebraucht - Befriedigend

    EUR 80,76

     Versand gratis 
    Versand innerhalb von USA

    Anzahl: 1 verfügbar

    Zustand: good. A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes KönigreichRia Christie Collections

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 109,97

    EUR 13,14 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: Mehr als 20 verfügbar

    Zustand: New. In.

  • Sprache: Englisch

    Verlag: Springer 1994-05, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Chiron Media, Wallingford, Vereinigtes KönigreichChiron Media

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 107,03

    EUR 18,02 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: 10 verfügbar

    PF. Zustand: New.

  • Sprache: Englisch

    Verlag: Springer Berlin Heidelberg, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: moluna, Greven, Deutschlandmoluna

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 92,27

    EUR 48,99 Versand 
    Versand von Deutschland nach USA

    Anzahl: Mehr als 20 verfügbar

    Zustand: New.

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Books Puddle, New York, NY, USABooks Puddle

    Verkäufer/-in mit 4 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 142,68

    EUR 3,44 Versand 
    Versand innerhalb von USA

    Anzahl: 4 verfügbar

    Zustand: New. pp. 164.

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Revaluation Books, Exeter, Vereinigtes KönigreichRevaluation Books

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 150,13

    EUR 11,64 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: 2 verfügbar

    Paperback. Zustand: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock.

  • Sprache: Englisch

    Verlag: Springer, Springer Vieweg, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: AHA-BUCH GmbH, Einbeck, DeutschlandAHA-BUCH GmbH

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 106,99

    EUR 61,30 Versand 
    Versand von Deutschland nach USA

    Anzahl: 1 verfügbar

    Taschenbuch. Zustand: Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

  • Sprache: Englisch

    Verlag: Springer Spektrum, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Buchpark, Trebbin, DeutschlandBuchpark

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Gebraucht - Gut

    EUR 83,44

    EUR 105,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 4 verfügbar

    Zustand: Gut. Zustand: Gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Mispah books, Redhill, SURRE, Vereinigtes KönigreichMispah books

    Verkäufer/-in mit 4 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Gebraucht - Wie neu

    EUR 164,19

    EUR 29,09 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: 1 verfügbar

    Paperback. Zustand: Like New. Like New. book.

  • Sprache: Englisch

    Verlag: Springer Spektrum, 1994

    354057834X / 9783540578345

    • Softcover

    Anbieter: Buchpark, Trebbin, DeutschlandBuchpark

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Gebraucht - Sehr gut

    EUR 85,94

    EUR 105,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 1 verfügbar

    Zustand: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).

  • Sprache: Englisch

    Verlag: Springer, Springer Spektrum Mai 1994, 1994

    354057834X / 9783540578345

    • Softcover
    • Print-on-Demand

    Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, DeutschlandBuchWeltWeit Ludwig Meier e.K.

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 106,99

    EUR 23,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 2 verfügbar

    Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). 164 pp. Englisch.

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover
    • Print-on-Demand

    Anbieter: Majestic Books, Hounslow, Vereinigtes KönigreichMajestic Books

    Verkäufer/-in mit 4 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 146,03

    EUR 7,56 Versand 
    Versand von Vereinigtes Königreich nach USA

    Anzahl: 4 verfügbar

    Zustand: New. Print on Demand pp. 164 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam.

  • Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover
    • Print-on-Demand

    Anbieter: Biblios, frankfurt am main, HESSE, DeutschlandBiblios

    Verkäufer/-in mit 4 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 149,92

    EUR 9,95 Versand 
    Versand von Deutschland nach USA

    Anzahl: 4 verfügbar

    Zustand: New. PRINT ON DEMAND pp. 164.

  • Weitere Bilder

    Sprache: Englisch

    Verlag: Springer, 1994

    354057834X / 9783540578345

    • Softcover
    • Print-on-Demand

    Anbieter: preigu, Osnabrück, Deutschlandpreigu

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 95,70

    EUR 70,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 5 verfügbar

    Taschenbuch. Zustand: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | Lecture Notes in Economics and Mathematical Systems | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu Print on Demand.

  • Sprache: Englisch

    Verlag: Springer, J.B. Metzler Mai 1994, 1994

    354057834X / 9783540578345

    • Softcover
    • Print-on-Demand

    Anbieter: buchversandmimpf2000, Emtmannsberg, BAYE, Deutschlandbuchversandmimpf2000

    Verkäufer/-in mit 5 Sternen
    Verkäufer/-in kontaktieren

    Zustand: Neu

    EUR 106,99

    EUR 60,00 Versand 
    Versand von Deutschland nach USA

    Anzahl: 1 verfügbar

    Taschenbuch. Zustand: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 164 pp. Englisch.