Paperback. Zustand: Fair. No Jacket. Missing dust jacket; Readable copy. Pages may have considerable notes/highlighting. ~ ThriftBooks: Read More, Spend Less.
Zustand: acceptable. Used - Acceptable: All pages and the cover are intact, but shrink wrap, dust covers, or boxed set case may be missing. Pages may include limited notes, highlighting, or minor water damage but the text is readable. Item may be missing bundled media.
Verlag: Hoboken, New Jersey, U.S.A.: Wiley-Interscience, 1970
ISBN 10: 0471032468 ISBN 13: 9780471032465
Sprache: Englisch
Anbieter: Bingo Books 2, Vancouver, WA, USA
Hardcover. Zustand: Very Good. 2nd Edition. second edition hardback book in very good condition,name at top of first blank page.
Anbieter: BookDepart, Shepherdstown, WV, USA
Hardcover. Zustand: UsedGood. Hardcover; 3rd edition; technical library copy with minimal stampings; reference number taped to the spine; fading, soiling, and edge wear to exterior; bump to the upper front corner; in good condition with clean text and tight binding.
hardcover. Zustand: Acceptable. The item is showing use from the previous owner but works perfectly. Signs of previous ownership which could include: tears, scuffing, notes, excessive highlighting, gift inscriptions, slight water damage, a missing dust jacket, and library markings.
Hardcover. Zustand: Near Fine. 3rd Edition. 3rd edition hardback book in near fine condition.
hardcover. Zustand: Acceptable. Connecting readers with great books since 1972. Used textbooks may not include companion materials such as access codes, etc. May have condition issues including wear and notes/highlighting. We ship orders daily and Customer Service is our top priority!
Hardcover. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Hardcover. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Hardcover. Zustand: Good. No Jacket. Missing dust jacket; Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Hardcover. Zustand: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Hardcover. Zustand: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less.
Anbieter: Bingo Books 2, Vancouver, WA, USA
Hardcover. Zustand: Near Fine. Zustand des Schutzumschlags: Very Good. 3rd Edition. 3rd edition hardback book in near fine condition,dust jacket is very good.
Anbieter: BookDepart, Shepherdstown, WV, USA
Hardcover. Zustand: UsedGood. Hardcover, second edition; surplus library copy with the usual stampings; reference number taped to spine; fading and edge wear to exterior; otherwise in good condition with clean text, firm binding.
Verlag: Wiley & Sons, Incorporated, John, 1991
ISBN 10: 0471620572 ISBN 13: 9780471620570
Sprache: Englisch
Anbieter: Better World Books Ltd, Dunfermline, Vereinigtes Königreich
EUR 28,99
Anzahl: 2 verfügbar
In den WarenkorbZustand: Good. 4th. Ships from the UK. Former library book; may include library markings. Used book that is in clean, average condition without any missing pages.
Anbieter: Mr Pickwick's Fine Old Books, Katoomba, NSW, Australien
Hardcover (Original Cloth). Zustand: Very Good. Zustand des Schutzumschlags: No Dust Jacket. Second Edition. One of a collection of 150 specialist Trade books, including carpentry, wood turning, wooden boat building,stonemasonry, blacksmithing, tile making and the like. All are available for sale at this site. Use the special keyword pickwicktrade to compile an on-screen list of all these still available. Size: Octavo (standard book size). 414 pages. Text body is clean, and free from previous owner annotation, underlining and highlighting. Binding is tight, covers and spine fully intact. No foxing in this copy. Edges browned slightly. Quantity Available: 1. Shipped Weight: Under 1 kilogram. Category: Engineering, Industrial, Trade; ISBN: 0471032468. ISBN/EAN: 9780471032465. All our pictures shown here are of the actual item, not stock photos. Inventory No: 32060. For further info on this title, click on the "Contact Seller" button within this listing. We will try to reply within 24 hours. Otherwise you can order right now (inclusive of shipping options) from the "Add to Basket" button to the right.
Zustand: new.
Zustand: New.
Zustand: New.
Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich
EUR 163,89
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New.
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
EUR 168,93
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. In.
Zustand: As New. Unread book in perfect condition.
Verlag: John Wiley & Sons Inc, New York, 1990
ISBN 10: 0471620572 ISBN 13: 9780471620570
Sprache: Englisch
Anbieter: Grand Eagle Retail, Bensenville, IL, USA
Hardcover. Zustand: new. Hardcover. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Shipping may be from multiple locations in the US or from the UK, depending on stock availability.
Anbieter: GreatBookPricesUK, Woodford Green, Vereinigtes Königreich
EUR 191,12
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: As New. Unread book in perfect condition.
Verlag: John Wiley & Sons Inc, New York, 1990
ISBN 10: 0471620572 ISBN 13: 9780471620570
Sprache: Englisch
Anbieter: CitiRetail, Stevenage, Vereinigtes Königreich
EUR 185,00
Anzahl: 1 verfügbar
In den WarenkorbHardcover. Zustand: new. Hardcover. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.
Anbieter: Majestic Books, Hounslow, Vereinigtes Königreich
EUR 221,55
Anzahl: 3 verfügbar
In den WarenkorbZustand: New. pp. 448.
Zustand: New. pp. 448 4th Edition.
Anbieter: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Irland
EUR 221,88
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Num Pages: 448 pages, index. BIC Classification: TBJ; TNK. Category: (P) Professional & Vocational; (XV) Technical / Manuals. Dimension: 236 x 165 x 30. Weight in Grams: 792. . 1990. 4th. Hardcover. . . . .
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
EUR 249,89
Anzahl: 2 verfügbar
In den WarenkorbHardcover. Zustand: Brand New. 4th sub edition. 448 pages. 9.50x6.50x1.00 inches. In Stock.
Zustand: New. An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Num Pages: 448 pages, index. BIC Classification: TBJ; TNK. Category: (P) Professional & Vocational; (XV) Technical / Manuals. Dimension: 236 x 165 x 30. Weight in Grams: 792. . 1990. 4th. Hardcover. . . . . Books ship from the US and Ireland.