Anbieter: NEPO UG, Rüsselsheim am Main, Deutschland
Taschenbuch. Zustand: Gut. 154 Seiten ex Library Book aus einer wissenschafltichen Bibliothek Altersfreigabe FSK ab 0 Jahre Sprache: Englisch Gewicht in Gramm: 227.
Anbieter: Ria Christie Collections, Uxbridge, Vereinigtes Königreich
EUR 106,25
Anzahl: Mehr als 20 verfügbar
In den WarenkorbZustand: New. In.
Anbieter: ralfs-buecherkiste, Herzfelde, MOL, Deutschland
Paperback/ broschiert. Zustand: Wie neu. 142 S. Mathematics Mathematik Wirtschaftsmathematik Economy Guter Zustand/ Good Ex-Library, vereinzelt Bleistiftanstreichungen ha1081829 Sprache: Englisch Gewicht in Gramm: 250.
Anbieter: Chiron Media, Wallingford, Vereinigtes Königreich
EUR 106,25
Anzahl: 10 verfügbar
In den WarenkorbPF. Zustand: New.
Zustand: New.
Anbieter: Revaluation Books, Exeter, Vereinigtes Königreich
EUR 150,67
Anzahl: 2 verfügbar
In den WarenkorbPaperback. Zustand: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock.
Sprache: Englisch
Verlag: Springer, Springer Vieweg, 1994
ISBN 10: 354057834X ISBN 13: 9783540578345
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Anbieter: preigu, Osnabrück, Deutschland
Taschenbuch. Zustand: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu.
Anbieter: Buchpark, Trebbin, Deutschland
EUR 75,10
Anzahl: 4 verfügbar
In den WarenkorbZustand: Gut. Zustand: Gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Anbieter: Buchpark, Trebbin, Deutschland
EUR 75,10
Anzahl: 1 verfügbar
In den WarenkorbZustand: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Anbieter: Mispah books, Redhill, SURRE, Vereinigtes Königreich
EUR 155,86
Anzahl: 1 verfügbar
In den WarenkorbPaperback. Zustand: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.
Anbieter: Mispah books, Redhill, SURRE, Vereinigtes Königreich
EUR 163,00
Anzahl: 1 verfügbar
In den WarenkorbPaperback. Zustand: Like New. Like New. book.