National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
Verlag: United States General Accounting Office, Washington DC, 1993
- Erstausgabe
- Softcover
- Gebraucht
Anbieter: Ground Zero Books, Ltd., Silver Spring, MD, USAGround Zero Books, Ltd.
Verkäufer:in bei AbeBooks seit 14. August 1998
Zustand: Gebraucht - Gut
EUR 32,04
Anzahl: 1 verfügbar
In den WarenkorbArtikelbeschreibung des Verkäufers
12 pages, plus covers. This is a "Report to Congressional Requesters". Pursuant to a congressional request, GAO reviewed the National Aero-Space Plane (NASP) Program, focusing on the: (1) status of efforts to resolve the program's cost, schedule, and technical problems; and (2) lack of top-level management direction. The presidentially directed NASP Program is a joint Department of Defense (DoD)/National Aeronautics and Space Administration (NASA) technology development and demonstration program. The program's goal is to provide the technological basis for future space launch and hypersonic flight vehicles by developing critical or enabling technologies, such as the scramjet engine. DOD and NASA intended to demonstrate these technologies by building and testing the X-30, a manned experimental flight vehicle that is to be capable of single-stage-to-orbit (SSTO) flight. The concept is to develop a vehicle that can take off horizontally from a runway; reach hypersonic speeds of up to 25 times the speed of sound (Mach 25); and attain low earth orbit, without the use of external booster rockets or propellant tanks. The program currently consists of three phases. Phase I (1982 to 1985), which preceded the formal initiation of the program, evaluated the feasibility and technical concept for an aerospace plane. Phase II (1985 to 1994) is a technology development and maturation phase. The program was in the final segment of phase II, which was intended to develop the critical technologies and manufacturing processes, build and test specific structural articles, and test a subscale engine to demonstrate the propulsion system's concept. A decision was to be made in September 1993 based on cost and technical maturity on whether to proceed into phase III, which involves designing, building, and testing the X-30. However, funding constraints and technical concerns have caused DOD and NASA to reconsider the timing of this decision and to restructure the current contract and associated technical efforts. The National Space Council had been responsible for developing overall national policy, direction, and guidance on space activities such as the NASP Program; however, the new administration has designated the Office of Science and Technology Policy to assume these roles. In 1986, the Secretary of Defense and the Administrator of NASA chartered the NASP Steering Group to provide policy, guidance, and broad programmatic direction to the program. Among the Steering Group's tasks were approving both the program's entrance into phase III (subject to the consent of the Secretary of Defense and Administrator of NASA) and substantive changes to the program, resolving programmatic issues, and reviewing proposed changes and making recommendations relative to the program's funding. The Steering Group is currently chaired by the Under Secretary of Defense for Acquisition and the Deputy Administrator of NASA is vice-chair. The Air Force is the program's executive agency and has established a Joint Program Office at Wright-Patterson Air Force Base, Ohio, to manage the program. The NASP National Contractor Team, consisting of five major aerospace contractors is responsible for the majority of the technology development efforts. Since fiscal year 1986, Congress has provided about $1.7 billion to DOD and NASA for phase Il. GAO reported in December 1992 that the projected cost for the baseline program had increased from $3.1 billion to $17.0 billion, the time frames for achieving such milestones as first flight were uncertain, and the development of key technologies had encountered difficulties. These cost, schedule, and technical problems will not be resolved by the completion of the currently planned phase II efforts. Consequently, a decision to begin phase III has been effectively deferred. Neither the Office of Science and Technology Policy, the Steering Group, nor DOD has provided clear direction on what the program's future efforts and objectives should.…
Bestandsnummer des Verkäufers 91245
Bibliografische Details
- Titel
- National Aero-Space Plane; A Need for Program Direction and Funding Decisions (GAO/NSIAD-93-207)
- Autor
- United States General Accounting Office
- Verlag
- United States General Accounting Office, Washington DC
- Erscheinungsjahr
- 1993
- Zustand
- Very good
- Einband
- Wraps
- Auflage
- Presumed First Edition, First Printing.
- Verkäuferkataloge
- NASA
Ground Zero Books, Ltd.
Silver Spring, MD, USA
Verkäufer:in bei AbeBooks seit 14. August 1998
Versandkosten innerhalb von USA
| Artikel | 5 bis 20 Werktage | 3 bis 6 Werktage |
|---|---|---|
| Erster Artikel | EUR 4,44 | EUR 6,67 |
Zahlungsarten
- PayPal
- Rechnung
- Vorauskasse
- Zahlungsanweisung
Shopbeschreibung
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Spezialisierung
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarUnternehmensdaten der Verkäuferin bzw. des Verkäufers
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD USA 20910-2254
Verkaufsbedingungen
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Widerrufsrecht
Wenn Sie Verbraucher sind, können Sie gemäß den folgenden Bestimmungen vom Vertrag zurücktreten. Verbraucher ist jede natürliche Person, die zu Zwecken handelt, die nicht ihrer kaufmännischen, gewerblichen, künstlerischen oder beruflichen Tätigkeit zugerechnet werden können.
Informationen zum Widerrufsrecht
Gesetzliches Widerrufsrecht
Sie haben das Recht, den Vertrag innerhalb von 14 Tagen ohne Angabe von Gründen zu widerrufen.
Die Widerrufsfrist beträgt 14 Tage ab dem Tag, an dem Sie oder ein von Ihnen benannter Dritter, der nicht der Transporteur ist, die letzte Ware oder den letzten Posten oder das letzte Exemplar in Besitz genommen hat.
Um das Widerrufsrecht auszuüben, füllen Sie auf unserer Website unter „Meine Einkäufe" in „Mein Nutzerkonto" eine eindeutige Erklärung elektronisch aus und senden Sie sie ab. Wir werden Ihnen unverzüglich eine Bestätigung über den Eingang eines solchen Widerrufs auf einem dauerhaften Datenträger (z. B. per E-Mail) übermitteln.
Um die Widerrufsfrist einzuhalten, reicht es aus, dass Sie Ihre Mitteilung über die Ausübung des Widerrufsrechts vor Ablauf der Widerrufsfrist absenden.
Auswirkungen des Widerrufs
Wenn Sie diesen Vertrag widerrufen, erstatten wir Ihnen alle Zahlungen, die wir von Ihnen erhalten haben, einschließlich der Lieferkosten (mit Ausnahme der zusätzlichen Kosten, die entstehen, wenn Sie eine andere Art der Lieferung als die von uns angebotene günstigste Standardlieferung gewählt haben).
Wir können einen Abzug von der Rückerstattung für den Wertverlust der gelieferten Waren vornehmen, wenn der Verlust auf eine unnötige Behandlung durch Sie zurückzuführen ist.
Wir werden die Rückerstattung unverzüglich und nicht später als 14 Tage nach dem Tag vornehmen, an dem wir über Ihre Entscheidung, diesen Vertrag zu widerrufen, informiert wurden.
Für die Rückerstattung verwenden wir dasselbe Zahlungsmittel, das Sie für die ursprüngliche Transaktion verwendet haben, es sei denn, Sie haben ausdrücklich etwas anderes vereinbart; in keinem Fall werden Ihnen aufgrund einer solchen Rückerstattung Gebühren berechnet.
Wir können die Rückzahlung verweigern, bis wir die Waren wieder zurückerhalten haben oder Sie den Nachweis erbracht haben, dass Sie die Waren zurückgesandt haben, je nachdem, was eher eintritt.
Sie müssen die Waren unverzüglich und in jedem Fall spätestens 14 Tage ab dem Tag, an dem Sie uns über den Widerruf dieses Vertrags unterrichten, an Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, zurücksenden oder übergeben. Die Frist ist eingehalten, wenn Sie die Ware vor Ablauf der Frist von 14 Tagen zurücksenden. Sie müssen die direkten Kosten der Rücksendung der Waren tragen. Sie haften nur für einen etwaigen Wertverlust der Waren, der auf eine Behandlung zurückzuführen ist, die nicht zur Prüfung der Art, Eigenschaften und Funktionsweise der Waren erforderlich ist.
Ausnahmen vom Widerrufsrecht
Das Widerrufsrecht gilt nicht für:
- Die Lieferung von Zeitungen, Zeitschriften oder Magazinen mit Ausnahme von Abonnementverträgen; und
- Die Lieferung digitaler Inhalte, die nicht auf einem physischen Medium (z. B. auf einer CD oder DVD) geliefert werden, wenn Sie bei Ihrer Bestellung akzeptiert haben, dass wir mit der Lieferung beginnen können und dass Sie nach Beginn der Lieferung den Vertrag nicht mehr widerrufen können.
Versandbedingungen
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.