Verwandte Artikel zu Project Scheduling with Time Windows and Scarce Resources:...

Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions - Softcover

 
9783642534799: Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Zu dieser ISBN ist aktuell kein Angebot verfügbar.

Inhaltsangabe

1 Temporal Project Scheduling.- 1.1 Minimum and maximum time lags.- 1.2 Activity-on-node project networks.- 1.3 Temporal project scheduling computations.- 1.4 Orders in the set of activities.- 2 Resource-Constrained Project Scheduling - Minimization of Project Duration.- 2.1 Formulation of the problem.- 2.2 Cycle structures in activity-on-node project networks.- 2.3 Properties of the feasible region.- 2.3.1 Strict orders and order polyhedra.- 2.3.2 Forbidden sets and resolution of resource conflicts.- 2.4 Different types of shifts and sets of schedules.- 2.5 Branch-and-bound and truncated branch-and-bound methods.- 2.5.1 Enumeration scheme.- 2.5.2 Preprocessing.- 2.5.3 Lower bounds.- 2.5.4 Branch-and-bound algorithm.- 2.5.5 Truncated branch-and-bound methods.- 2.5.6 Alternative enumeration schemes.- 2.5.7 Alternative preprocessing and constraint propagation.- 2.5.8 Alternative lower bounds.- 2.6 Priority-rule methods.- 2.6.1 Direct method.- 2.6.2 Decomposition methods.- 2.6.3 Priority rules.- 2.6.4 Serial generation scheme.- 2.6.5 Parallel generation scheme.- 2.7 Schedule-improvement procedures.- 2.7.1 Genetic algorithm.- 2.7.2 Tabu search.- 2.8 Experimental performance analysis.- 2.8.1 Random generation of projects.- 2.8.2 Computational experience.- 2.9 Application to make-to-order production in manufacturing industry.- 2.10 Regular objective functions different from project duration.- 2.11 Calendarization.- 2.12 Project scheduling with cumulative resources.- 2.12.1 Discrete cumulative resources.- 2.12.2 Continuous cumulative resources.- 2.13 Project scheduling with synchronizing resources.- 2.14 Project scheduling with sequence-dependent changeover times.- 2.15 Multi-mode project scheduling problems.- 2.15.1 Problem formulation and basic properties.- 2.15.2 Solution methods.- 2.16 Application to batch production in process industries.- 2.16.1 Case study.- 2.16.2 Batching problem.- 2.16.3 Project scheduling model for batch scheduling.- 2.16.4 Solution procedure for batch scheduling.- 3 Resource-Constrained Project Scheduling - Minimization of General Objective Functions.- 3.1 Different objective functions.- 3.2 Additional types of shifts and sets of schedules.- 3.3 Classification of objective functions.- 3.3.1 Separable and resource-utilization dependent objective functions.- 3.3.2 Class 1 of regular objective functions.- 3.3.3 Class 2 of antiregular objective functions.- 3.3.4 Class 3 of convex objective functions.- 3.3.5 Class 4 of binary-monotone objective functions.- 3.3.6 Class 5 of quasiconcave objective functions.- 3.3.7 Class 6 of locally regular objective functions.- 3.3.8 Class 7 of locally quasiconcave objective functions.- 3.4 Time complexity of time-constrained project scheduling.- 3.5 Relaxation-based approach for function classes 1 to 5.- 3.5.1 General enumeration scheme.- 3.5.2 Branch-and-bound algorithm for the net present value problem.- 3.5.3 Branch-and-bound algorithm for the earliness-tardiness problem.- 3.6 Tree-based approach for function classes 6 and 7.- 3.6.1 General enumeration scheme.- 3.6.2 Branch-and-bound algorithms for resource investment, resource levelling, and resource renting problems.- 3.6.3 Experimental performance analysis.- 3.6.4 Alternative lower bounds.- 3.7 Priority-rule methods.- 3.7.1 Time-constrained project scheduling.- 3.7.2 Resource-constrained project scheduling.- 3.7.3 Experimental performance analysis.- 3.8 Schedule-improvement procedures.- 3.8.1 Neighborhoods for project scheduling problems.- 3.8.2 A tabu search procedure.- 3.9 Application to investment projects.- 3.9.1 Computation of the net present value function.- 3.9.2 Decision support.- 3.10 Hierarchical project planning.- References.- List of Symbols.- Three-Field Classification for Resource-Constrained Project Scheduling.

Die Inhaltsangabe kann sich auf eine andere Ausgabe dieses Titels beziehen.

(Keine Angebote verfügbar)

Buch Finden:



Kaufgesuch aufgeben

Sie finden Ihr gewünschtes Buch nicht? Wir suchen weiter für Sie. Sobald einer unserer Buchverkäufer das Buch bei AbeBooks anbietet, werden wir Sie informieren!

Kaufgesuch aufgeben

Weitere beliebte Ausgaben desselben Titels