EUR 6,59 für den Versand von Vereinigtes Königreich nach USA
Versandziele, Kosten & DauerEUR 23,00 für den Versand von Deutschland nach USA
Versandziele, Kosten & DauerAnbieter: WorldofBooks, Goring-By-Sea, WS, Vereinigtes Königreich
Paperback. Zustand: Fine. Bestandsnummer des Verkäufers GOR013170603
Anzahl: 1 verfügbar
Anbieter: Buchpark, Trebbin, Deutschland
Zustand: Sehr gut. Zustand: Sehr gut - Gepflegter, sauberer Zustand. | Seiten: 168 | Sprache: Englisch | Produktart: Bücher. Bestandsnummer des Verkäufers 34245593/2
Anzahl: 3 verfügbar
Anbieter: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Deutschland
Taschenbuch. Zustand: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This research reports the effects of ALAP/ASAP constraints in the MS Project. It defines and explains the ALAP and ASAP constraints. It covers both MS Project and Primavera Project Planner pieces of scheduling software which have such constraint features: As Soon As Possible (ASAP); As Late As Possible (ALAP); Start No Earlier Than (SNET); Start No Later Than (SNLT); Finish No Earlier Than (FNET); Finish No Later Than (FNLT); Must Start On (MSO); and Must Finish On (MFO). Several literature sources show that only few practitioners know how to apply these constraints properly. They contend that scheduling practice is done on a hit or miss basis without regards to best practice standards. This book is an attempt to replace intuition with scientific reasoning. Practitioners do not know what project scenarios should early or late start scheduling option are applied. The book prepares users of scheduling software to develop project schedules that are effective with reduced possibility of promising the impossible. The book is an important companion for practitioners as well as training manual for scheduling engineers, project managers, architects, builders and quantity surveyors. 168 pp. Englisch. Bestandsnummer des Verkäufers 9786139931767
Anzahl: 2 verfügbar
Anbieter: AHA-BUCH GmbH, Einbeck, Deutschland
Taschenbuch. Zustand: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This research reports the effects of ALAP/ASAP constraints in the MS Project. It defines and explains the ALAP and ASAP constraints. It covers both MS Project and Primavera Project Planner pieces of scheduling software which have such constraint features: As Soon As Possible (ASAP); As Late As Possible (ALAP); Start No Earlier Than (SNET); Start No Later Than (SNLT); Finish No Earlier Than (FNET); Finish No Later Than (FNLT); Must Start On (MSO); and Must Finish On (MFO). Several literature sources show that only few practitioners know how to apply these constraints properly. They contend that scheduling practice is done on a hit or miss basis without regards to best practice standards. This book is an attempt to replace intuition with scientific reasoning. Practitioners do not know what project scenarios should early or late start scheduling option are applied. The book prepares users of scheduling software to develop project schedules that are effective with reduced possibility of promising the impossible. The book is an important companion for practitioners as well as training manual for scheduling engineers, project managers, architects, builders and quantity surveyors. Bestandsnummer des Verkäufers 9786139931767
Anzahl: 1 verfügbar
Anbieter: moluna, Greven, Deutschland
Zustand: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Efole FridayThe author Mr. Efole, Friday Eziodawhe was born in 1962 in Olomoro town, Isoko LGA of Delta state, Nigeria. He holds BSc in Quantity Surveying, (1987), MSc in construction management, (2001) and MPhil in construction mana. Bestandsnummer des Verkäufers 385877905
Anzahl: Mehr als 20 verfügbar